Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Briercliffe Road Bolton BL3 5PN

Granted Bolton 18248/24 Full Planning Permission

Works: Extension Domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A TWO STOREY EXTENSION TO SIDE TO CREATE NEW 3NO. BEDROOM DWELLING.

As published by the council, reference 18248/24

Application record

Reference
18248/24
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
20 May 2024
Validated
20 May 2024
Decided
12 Sep 2024
Ward
Rumworth
Decision by
Delegated Decision
Postcode
BL3 5PN

Timeline

Dates from the published record

  1. 20 May 2024

    Received by Bolton

  2. 12 Sep 2024

    Decision issued: Approve subject to conditions

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Nottingham

26 applications on PlanIndex · across 3 councils · 75% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 11 Hibernia Street Bolton BL3 5PQ

    00614/26 Submitted 1 Apr 2026 82m away

    ERECTION OF TWO STOREY SIDE EXTENSION, PART SINGLE/PART TWO STOREY REAR EXTENSION AND SINGLE STOREY FRONT EXTENSION

    Granted Householder Extension 4 docs
    Small domestic
  • 67 Melbourne Road Bolton BL3 5RW

    00492/26 Submitted 18 Mar 2026 166m away

    DEMOLITION OF SINGLE STOREY SIDE AND REAR EXTENSION AND ERECTION OF PART SINGLE/PART TWO STOREY REAR EXTENSION

    Granted Householder Extension Demolition 7 docs
    Small domestic
  • 19 Broomfield Road Bolton BL3 4DB

    11419/21 Submitted 2 Jun 2021 168m away

    CERTIFICATE OF LAWFUL DEVELOPMENT (S191) FOR CONTINUED USE AS A DWELLING FOR MORE THAN FOUR YEARS AFTER EXTENSION COMPLETED

    Granted Lawful development Extension 6 docs
    Domestic
  • 32 Jessie Street Bolton BL3 5PE

    10789/21 Submitted 19 Mar 2021 178m away

    ERECTION OF DORMER AND TWO STOREY EXTENSION AT REAR

    Granted Full applications Extension Loft or dormer 4 docs
  • 9 Alice Street Bolton BL3 5PJ

    01300/26 Submitted 14 Jul 2026 213m away

    83% historically approved · decision due ~8 Sep

    ERECTION OF A PART SINGLE PART TWO STOREY REAR EXTENSION

    Awaiting decision Extension 4 docs
  • 6 Melbourne Road Bolton BL3 5RQ

    15187/22 Submitted 18 Dec 2022 232m away

    ERECTION OF PART SINGLE / PART TWO STOREY EXTENSION WITH DORMER TO REAR

    Refused Full applications Extension Loft or dormer 7 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications