Skip to content
PlanIndex Get alerts
Menu

Planning application

165 Tonge Moor Road Bolton BL2 2HR

Refused Bolton 18220/24 Full Planning Permission

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

CHANGE OF USE FROM 6NO. BEDROOM HOUSE OF MULTIPLE OCCUPANCY (HMO) (USE CLASS C4) INTO 7NO. BEDROOM HOUSE OF MULTIPLE OCCUPANCY (HMO) (SUI GENERIS)

As published by the council, reference 18220/24

Application record

Reference
18220/24
Type
Full Planning Permission
Status
Decided
Decision
Refused
Received
16 May 2024
Validated
16 May 2024
Decided
19 Sep 2024
Ward
Tonge With The Haulgh
Decision by
Delegated Decision
Postcode
BL2 2HR

Timeline

Dates from the published record

  1. 16 May 2024

    Received by Bolton

  2. 19 Sep 2024

    Decision issued: Refused

  3. 24 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

11 applications on PlanIndex · across 4 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 172 Tonge Moor Road Bolton BL2 2HN

    18787/24 Submitted 12 Aug 2024 45m away

    CHANGE OF USE FROM DWELLINGHOUSE INTO A HMO (8 BEDROOMS) TOGETHER WITH A TWO STOREY REAR EXTENSION AND A DORMER TO REAR

    Refused Full applications Extension Loft or dormer 10 docs
    Domestic
  • 172 Tonge Moor Road Bolton BL2 2HN

    00879/26 Submitted 14 May 2026 45m away

    CHANGE OF USE FROM DWELLING (CLASS C3) TO 4 NO. BEDROOM HMO FOR 4 NO. OCCUPANTS (CLASS C4)

    Granted Full applications 11 docs
    Domestic
  • 120 Tonge Moor Road (outbuilding To The Rear) Bolton BL2 2DP

    00661/26 Submitted 10 Apr 2026 170m away

    RETROSPECTIVE APPLICATION FOR THE CHANGE OF USE FROM REAR OUTBUILDING (GARAGE) TO PET FUNERAL SERVICES (CLASS E(c)(iii))

    Granted Full applications 10 docs
  • 134 Tonge Moor Road Bolton BL2 2DP

    01095/26 Submitted 15 Jun 2026 202m away

    83% historically approved · decision due ~10 Aug

    CHANGE OF USE FROM DWELLING (CLASS C3) TO 5 NO. BEDROOM HMO (CLASS C4) FOR 5 OCCUPANTS

    Decided 11 docs
    Domestic
  • Thicketford Centre Thicketford Road Bolton BL2 2LW

    11582/21 Submitted 23 Jun 2021 211m away

    PROVISION OF 2NO. NEW AIR SOURCE HEAT PUMPS SUPPLEMENTING EXISITNG MECHANICAL SERVICES TO BUILDING

    Granted Full applications 6 docs
  • 107 Eldon Street Bolton BL2 2JF

    15682/23 Submitted 21 Mar 2023 221m away

    CERTIFICATE OF LAWFUL DEVELOPMENT (S192) FOR A PROPOSED HIP TO GABLE EXTENSION AND DORMER TO REAR

    Granted Lawful development Extension Loft or dormer 10 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications