Skip to content
PlanIndex Get alerts
Menu

Planning application

2 & 4 Vickers Close Bolton BL3 6JH

Granted Bolton 15353/23 Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A SINGLE STOREY REAR EXTENSION

As published by the council, reference 15353/23

Application record

Reference
15353/23
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
27 Jan 2023
Validated
27 Jan 2023
Decided
2 May 2023
Ward
Rumworth
Decision by
Delegated Decision
Postcode
BL3 6JH

Timeline

Dates from the published record

  1. 27 Jan 2023

    Received by Bolton

  2. 2 May 2023

    Decision issued: Approve subject to conditions

  3. 6 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Bolton

130 applications on PlanIndex · across 12 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 12 Vickers Close Bolton BL3 6JH

    00629/26 Submitted 3 Apr 2026 36m away

    ERECTION OF SINGLE STOREY REAR EXTENSION.

    Granted Householder Extension 7 docs
    Small domestic
  • 9 Weber Drive Bolton BL3 6JS

    07176/19 Submitted 21 Oct 2019 89m away

    PRIOR NOTIFICATION APPLICATION FOR A PROPOSED LARGER HOME EXTENSION AT REAR (6.0M LONG; 3.719M MAX HEIGHT; 2.65M EAVES HEIGHT)

    Granted Prior approval Extension 4 docs
  • 186 - 188 Derby Street Bolton BL3 6JN

    00767/26 Submitted 28 Apr 2026 93m away

    83% historically approved · decision due ~25 Aug

    RETROSPECTIVE APPLICATION FOR AC UNIT AT SIDE ELEVATION OF BUILDING.

    Awaiting decision
  • 156 - 158 Derby Street Bolton BL3 6JR

    19284/24 Submitted 12 Nov 2024 117m away

    REMOVAL OF EXISITING FLUE TOGETHER WITH THE SITING OF A REPLACEMENT EXTRACT FAN

    Granted Full applications 6 docs
  • 3 And 5 Filton Avenue Bolton BL3 5AN

    00270/26 Submitted 16 Feb 2026 162m away

    ERECTION OF SINGLE STOREY FRONT EXTENSION

    Granted Full applications Extension 5 docs
    Small domestic
  • 3 Filton Avenue Bolton BL3 5AN

    15207/22 Submitted 22 Dec 2022 165m away

    ERECTION OF SINGLE STOREY EXTENSION TO FRONT TOGETHER WITH PART SINGLE / PART TWO STOREY WITH DORMER TO REAR

    Refused Full applications Extension Loft or dormer 7 docs
    Small domestic

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications