Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Filton Avenue Bolton BL3 5AN

Refused Bolton 15207/22 Full Planning Permission

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

ERECTION OF SINGLE STOREY EXTENSION TO FRONT TOGETHER WITH PART SINGLE / PART TWO STOREY WITH DORMER TO REAR

As published by the council, reference 15207/22

Application record

Reference
15207/22
Type
Full Planning Permission
Status
Decided
Decision
Refused
Received
22 Dec 2022
Validated
22 Dec 2022
Decided
5 Apr 2023
Ward
Rumworth
Decision by
Delegated Decision
Postcode
BL3 5AN

Timeline

Dates from the published record

  1. 22 Dec 2022

    Received by Bolton

  2. 5 Apr 2023

    Decision issued: Refused

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Bolton

130 applications on PlanIndex · across 12 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 3 And 5 Filton Avenue Bolton BL3 5AN

    00270/26 Submitted 16 Feb 2026 3m away

    ERECTION OF SINGLE STOREY FRONT EXTENSION

    Granted Full applications Extension 5 docs
    Small domestic
  • 156 - 158 Derby Street Bolton BL3 6JR

    19284/24 Submitted 12 Nov 2024 157m away

    REMOVAL OF EXISITING FLUE TOGETHER WITH THE SITING OF A REPLACEMENT EXTRACT FAN

    Granted Full applications 6 docs
  • 145 Deane Plaza Deane Road Bolton BL3 5AH

    18833/24 Submitted 19 Aug 2024 164m away

    SITING OF 1No. FASCIA SIGN, 1No. PROJECTING SIGN TO FRONT ELEVATION TOGETHER WITH 1No. INTERNAL HANGING SIGN

    Granted Advertising 7 docs
  • 2 & 4 Vickers Close Bolton BL3 6JH

    15353/23 Submitted 27 Jan 2023 165m away

    ERECTION OF A SINGLE STOREY REAR EXTENSION

    Granted Full applications Extension 8 docs
    Small domestic
  • 106-108 Derby Street Bolton BL3 6HG

    12925/22 Submitted 10 Jan 2022 175m away

    ALTERATIONS TO PROVIDE 2NO. GROUND FLOOR COMMERCIAL UNITS (CLASS E) TOGETHER WITH CHANGE OF USE TO 6 BED HMO (CLASS C4) ON FIRST FLOOR INCLUDING RAISING OF ROOF AND TW0 REAR DORMERS, NEW EXTERNAL OPENINGS, REAR RAMP AND ASSOCIATED WORKS

    Granted Full applications Loft or dormer 6 docs
  • 130A Deane Road Bolton BL3 5DL

    19224/24 Submitted 30 Oct 2024 186m away

    CHANGE OF USE FROM CLASS C3 (DWELLING HOUSE) TO CLASS C2 (SUPPORTED LIVING)

    Refused Full applications 7 docs
    Domestic

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications