Skip to content
PlanIndex Get alerts
Menu

Planning application

117 Morris Green Lane Bolton BL3 3JE

Granted Bolton 15136/22 Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A SINGLE STOREY EXTENSION TO FRONT OF EXISTING SHOP

As published by the council, reference 15136/22

Application record

Reference
15136/22
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
9 Dec 2022
Validated
9 Dec 2022
Decided
27 Mar 2023
Ward
Hulton
Decision by
Delegated Decision
Postcode
BL3 3JE

Timeline

Dates from the published record

  1. 9 Dec 2022

    Received by Bolton

  2. 27 Mar 2023

    Decision issued: Approve subject to conditions

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Bolton

185 applications on PlanIndex · across 12 councils · 77% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • St Bede C Of E Primary School Morris Green Lane Bolton BL3 3LJ

    11412/21 Submitted 2 Jun 2021 83m away

    REMOVAL OF TEMPORARY STEEL STAIRCASE AND ERECTION OF 2No STEEL FRAMED STAIRCASE ENCLOSURES TO KS2 BLOCK TOGETHER WITH ASSOCIATED WORKS.

    Granted Full applications 16 docs
  • 31 Ellesmere Road Bolton BL3 3JT

    18822/24 Submitted 15 Aug 2024 109m away

    ERECTION OF A PART SINGLE STOREY/PART TWO STOREY REAR EXTENSION TOGETHER WITH DORMER.

    Granted Householder Extension Loft or dormer 6 docs
    Small domestic
  • 6 Fair Street Bolton BL3 3JY

    01229/26 Submitted 2 Jul 2026 154m away

    83% historically approved · decision due ~27 Aug

    ERECTION OF SINGLE STOREY REAR EXTENSION

    Awaiting decision Extension 4 docs
    Small domestic
  • 23 Morris Green Bolton BL3 3LD

    01519/26 Submitted 18 Aug 2026 165m away

    83% historically approved · decision due ~13 Oct

    ERECTION OF SINGLE STOREY REAR EXTENSION TOGETHER WITH REPLACEMENT FENCING

    Awaiting decision Extension 3 docs
    Small domestic
  • 208 Morris Green Lane Bolton BL3 3LB

    01100/26 Submitted 16 Jun 2026 218m away

    83% historically approved · decision due ~13 Aug

    DEMOLITION OF EXISTING GARAGE AND ERECTION OF PART SINGLE/PART TWO STOREY SIDE AND SINGLE STOREY REAR EXTENSIONS INCLUDING INSTALLATION OF BALCONY TOGETHER WITH ERECTION OF DETACHED OUTBUILDING FOR RESIDENTIAL USE

    Awaiting decision Extension Demolition 5 docs
    Small domestic
  • 35 Maldwyn Avenue Bolton BL3 3QP

    00896/26 Submitted 18 May 2026 223m away

    83% historically approved · decision due ~13 Jul

    CERTIFICATE OF LAWFULNESS FOR THE PROPOSED ERECTION OF A SINGLE STOREY REAR EXTENSION

    Decided Extension
    Small domestic

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications