Planning application

43 Hough Lane Bromley Cross Bolton BL7 9DB

Granted Bolton 11555/21 Full Planning Permission

Works: Extension Loft or dormer Demolition Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

DEMOLITION OF EXISTING REAR PORCH AND ERECTION OF A SINGLE STOREY EXTENSION AT REAR TOGETHER WITH REPLACEMENT OF FRONT DORMER WITH PITCHED ROOF AND ERECTION OF DORMER AT REAR

As published by the council, reference 11555/21

Application record

Reference
11555/21
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
21 Jun 2021
Validated
21 Jun 2021
Decided
11 Aug 2021
Ward
Bromley Cross
Decision by
Delegated Decision
Postcode
BL7 9DB

Timeline

Dates from the published record

  1. 21 Jun 2021

    Received by Bolton

  2. 11 Aug 2021

    Decision issued: Approve subject to conditions

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a design practice registered in Bolton

12 applications on PlanIndex · across 5 councils · 100% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

7 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10 Lower Tong Bolton BL7 9XT

    00243/26 Submitted 13 Feb 2026 191m away

    ERECTION OF A SINGLE STOREY FIRST FLOOR SIDE EXTENSION TOGETHER WITH ALTERATIONS TO FRONT CANOPY AND CONVERSION OF GARAGE TO HABITABLE ROOM

    Granted Householder Extension 11 docs
    Small domestic
  • Land To East Of Scholars Rise Scholars Rise Bolton

    00796/26 Submitted 30 Apr 2026 211m away

    APPLICATION FOR PERMISSION IN PRINCIPLE FOR ERECTION OF 1 NO. DWELLING

    Granted Outline 8 docs
    Domestic
  • The Schoolhouse School Street Bolton BL7 9DS

    00688/26 Submitted 15 Apr 2026 251m away

    83% historically approved · decision due ~29 Jul

    LISTED BUILDING WORKS FOR THE REPLACEMENT OF 3NO. WINDOWS AND THE INSTALLATION OF 1NO. CCTV CAMERA

    Awaiting decision Windows or glazing
  • The Schoolhouse School Street Bolton BL7 9DS

    01049/26 Submitted 8 Jun 2026 260m away

    83% historically approved · decision due ~4 Aug

    LISTED BUILDING CONSENT FOR INSTALLATION OF FIBRE BROADBAND TO GRADE II LISTED BUILDING

    Awaiting decision Heritage and listed buildings 6 docs
  • 410 Darwen Road Bromley Cross Bolton BL7 9JD

    15306/23 Submitted 18 Jan 2023 268m away

    ERECTION OF SINGLE STOREY EXTENSION TO REAR

    Granted Full applications Extension 6 docs
    Small domestic
  • 52 Stonesteads Way Bromley Cross Bolton BL7 9LA

    11278/21 Submitted 13 May 2021 276m away

    LOFT CONVERSION WITH DORMER ON EAST ELEVATION

    Refused Full applications Loft or dormer 9 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications