Skip to content
PlanIndex Get alerts
Menu

Planning application

9 Nixon Road Bolton BL3 3PX

Granted Bolton 10970/21 Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A PART TWO STOREY/PART SINGLE STOREY EXTENSION AT REAR

As published by the council, reference 10970/21

Application record

Reference
10970/21
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
7 Apr 2021
Validated
7 Apr 2021
Decided
11 Aug 2021
Ward
Rumworth
Decision by
Delegated Decision
Postcode
BL3 3PX

Timeline

Dates from the published record

  1. 7 Apr 2021

    Received by Bolton

  2. 11 Aug 2021

    Decision issued: Approve subject to conditions

  3. 7 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Bolton

130 applications on PlanIndex · across 12 councils · 80% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Majestic Self Drive Henry Lee Street Bolton BL3 3PT

    13238/22 Submitted 25 Feb 2022 112m away

    ERECTION OF A STEEL FRAME BUILDING TOGETHER WITH 41NO. SELF STORAGE CONTAINERS (USE CLASS B8).

    Granted Full applications 8 docs
  • 13 Woodbine Road Bolton BL3 3JH

    00795/26 Submitted 30 Apr 2026 146m away

    ERECTION OF SINGLE STOREY REAR EXTENSION.

    Granted Householder Extension 6 docs
    Small domestic
  • 204 Ellesmere Road Bolton BL3 3JN

    10773/21 Submitted 17 Mar 2021 159m away

    ERECTION OF PART SINGLE PART TWO STOREY EXTENSION AT SIDE AND SINGLE STOREY EXTENSION TO REAR

    Granted Full applications Extension 7 docs
    Small domestic
  • 198 Ellesmere Road Bolton BL3 3JN

    00527/26 Submitted 23 Mar 2026 174m away

    ERECTION OF SINGLE STOREY REAR EXTENSION TOGETHER WITH CONVERSION OF GARAGE INTO HABITABLE ROOM.

    Granted Householder Extension 8 docs
    Small domestic
  • 191 Ellesmere Road Bolton BL3 3JN

    19438/24 Submitted 10 Dec 2024 177m away

    CERTIFICATE OF LAWFUL DEVELOPMENT (S192) FOR THE ERECTION OF AN OUTBUILDING AT REAR

    Granted Lawful development 3 docs
  • 9-11 Morris Green Lane Bolton BL3 3JD

    15150/22 Submitted 12 Dec 2022 179m away

    DISCHARGE OF CONDITION 2 (ACOUSTIC REPORT) ON APPLICATION 08170/20

    Decided Conditions 3 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications