Skip to content
PlanIndex Get alerts
Menu

Planning application

3 Hadleigh Close Bolton BL1 7RQ

Granted Bolton 07127/19 Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A FIRST FLOOR SIDE EXTENSION

As published by the council, reference 07127/19

Application record

Reference
07127/19
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
16 Oct 2019
Validated
16 Oct 2019
Decided
5 Dec 2019
Ward
Astley Bridge
Decision by
Delegated Decision
Postcode
BL1 7RQ

Timeline

Dates from the published record

  1. 16 Oct 2019

    Received by Bolton

  2. 5 Dec 2019

    Decision issued: Approve subject to conditions

  3. 26 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Middlesex

19 applications on PlanIndex · across 11 councils · 86% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 20 Hadleigh Close Bolton BL1 7RQ

    15422/23 Submitted 7 Feb 2023 33m away

    DEMOLITION OF EXISTING CONSERVATORY TO REAR TOGETHER WITH ERECTION OF SINGLE STOREY WRAPAROUND EXTENSION TO REAR AND SIDE

    Granted Full applications Extension Demolition 24 docs
    Small domestic
  • 89 Thornham Drive Bolton BL1 7RF

    00542/26 Submitted 24 Mar 2026 33m away

    ERECTION OF TWO STOREY SIDE EXTENSION.

    Granted Householder Extension 12 docs
    Domestic
  • 91 Thornham Drive Bolton BL1 7RF

    19058/24 Submitted 1 Oct 2024 35m away

    ERECTION OF A TWO STOREY EXTENSION AT SIDE

    Granted Householder Extension 14 docs
    Domestic
  • 120 Thornham Drive Bolton BL1 7RF

    11777/21 Submitted 19 Jul 2021 107m away

    DEMOLITION OF CONSERVATORY AND GARAGE AND ERECTION OF SINGLE STOREY EXTENSION AND HOME OFFICE AT REAR

    Granted Full applications Extension Demolition 7 docs
    Small domestic
  • 2 Ranworth Close Bolton BL1 7RL

    14834/22 Submitted 19 Oct 2022 114m away

    ERECTION OF SINGLE STOREY EXTENSIONS AT SIDE AND REAR

    Granted Full applications Extension 5 docs
    Small domestic
  • 16 Ranworth Close Bolton BL1 7RL

    14817/22 Submitted 17 Oct 2022 130m away

    ERECTION OF TWO-STOREY FRONT EXTENSION, TWO-STOREY SIDE EXTENSION AND PART FIRST FLOOR/ PART TWO-STOREY REAR EXTENSION FOLLOWING THE DEMOLITION OF THE EXISTING GARAGE

    Granted Full applications Extension Demolition 4 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications