Skip to content
PlanIndex Get alerts
Menu

Planning application

1 Charlock Avenue Westhoughton Bolton BL5 2EF

Granted Bolton 07108/19 Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF A SINGLE STOREY SIDE/FRONT EXTENSION.

As published by the council, reference 07108/19

Application record

Reference
07108/19
Type
Full Planning Permission
Status
Decided
Decision
Approve subject to conditions
Received
14 Oct 2019
Validated
14 Oct 2019
Decided
12 Dec 2019
Ward
Westhoughton South
Parish
Westhoughton Town Council
Decision by
Delegated Decision
Postcode
BL5 2EF

Timeline

Dates from the published record

  1. 14 Oct 2019

    Received by Bolton

  2. 12 Dec 2019

    Decision issued: Approve subject to conditions

  3. 26 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 25 Alderton Drive Westhoughton Bolton BL5 2JD

    15579/23 Submitted 8 Mar 2023 112m away

    ERECTION OF SINGLE STOREY EXTENSION TO REAR AND SIDE WITH RENDER TO NEW EXTERNAL ELEVATIONS

    Granted Full applications Extension 6 docs
    Small domestic
  • 44 Sandalwood Bolton BL5 2RQ

    19212/24 Submitted 29 Oct 2024 149m away

    ERECTION OF A SINGLE STOREY SIDE AND REAR EXTENSION

    Granted Householder Extension 6 docs
    Small domestic
  • 8 Alderton Drive Westhoughton Bolton BL5 2JD

    15754/23 Submitted 3 Apr 2023 203m away

    CONVERSION OF GARAGE TO HABITABLE ROOM

    Granted Full applications 6 docs
  • 38 Southfield Drive Westhoughton Bolton BL5 2PP

    18713/24 Submitted 30 Jul 2024 282m away

    ERECTION OF A SINGLE STOREY SIDE EXTENSION

    Granted Householder Extension 22 docs
    Small domestic
  • St George's Oval Cappadocia Way Bolton BL5 2GG

    00934/26 Submitted 21 May 2026 300m away

    83% historically approved · decision due ~23 Aug

    INSTALLATION OF ENCLOSURE BOARDS, SYNTHETIC PLAYING SURFACE AND LIGHTING FOR 2NO. PADEL TENNIS COURTS

    Awaiting decision
  • 203 Wigan Road Westhoughton Bolton BL5 2AJ

    18117/24 Submitted 25 Apr 2024 325m away

    CONVERSION OF FIRST FLOOR TO FORM 3NO BED SELF CONTAINED FLAT INCLUDING CONVERSION OF LOFT AND INSTALLATION OF SKYLIGHTS TOGETHER WITH ERECTION OF FIRST FLOOR REAR EXTENSION, EXTERNAL STAIRCASE AND ASSOCIATED EXTERNAL ALTERATIONS

    Refused Full applications Extension 6 docs

In Bolton

  • 00365/26 Refused

    73 Kermoor Avenue Bolton BL1 7HW

    ERECTION OF 1NO. DETACHED DWELLING AND ASSOCIATED WORKS

    27 Feb 2026 Full applications
  • 21080/25 Granted

    J Dickinson And Sons Ltd Station Road Bolton BL6 5JE

    VARIATION OF CONDITIONS 1 AND 2 ON APPLICATION 16907/23 ALLOW FOR 24 HOUR OPERATIONS WITHIN UNITS 8 AND OPERATIONS UNTIL 11PM IN UNITS 9/10/11 (WASTE TRANSFER STATION) INCLUDING USE OF INTERNAL PLANT AND MACHINERY THROUGHOUT MONDAY TO SUNDAY AND INCLUDING BANK HOLIDAYS.

    22 Sep 2025 Full applications
  • 00820/26 Refused

    9 Tonge Fold Road Bolton BL2 6AW

    DEMOLITION OF EXISTING DWELLING AND ERECTION OF 6 NO. DWELLINGS TOGETHER WITH ASSOCIATED CAR PARKING

    7 May 2026 Full applications
  • 00394/26 Granted

    Rock Hall Moses Gate Country Park Hall Lane Farnworth BL4 7QE

    CHANGE OF USE OF GRADE II LISTED BUILDING TO CAFÉ WITH EXHIBITION, EVENTS, WORKSHOP AND OFFICE SPACES TOGETHER WITH DEMOLITION OF EXISTING TWO STOREY REAR EXTENSION AND ERECTION OF NEW THREE STOREY REAR EXTENSION WITH ROOF TERRACE AND BASEMENT, LANDSCAPING WORKS AND ASSOCIATED RESTORATION WORKS TO BUILDING INCLUDING INSTALLATION OF FRONT DOOR, TIMBER SASH WINDOWS AND HEAT PUMP SYSTEM

    4 Mar 2026 Full applications
  • 00252/26 Granted

    Albert Road Car Sales 113 Albert Road Bolton BL4 9EA

    DEMOLITION OF 2NO. EXISTING SINGLE STOREY BUILDINGS TOGETHER WITH THE ERECTION OF A CAR SHOWROOM WITH ANCILLARY OFFICES AND VALETING BAY

    13 Feb 2026 Full applications