Planning application
Unit E1 Hulton Heys Way Bolton BL5 1FJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
INSTALLTION OF MECHANICAL PLANT COMPRISING 2 NO. AIR CONDITIONING UNIT TOGETHER WITH ANCILLARY WORKS
As published by the council, reference 01491/26
Application record
- Reference
- 01491/26
- Status
- Decided
- Decision
- Granted As published: Approve subject to conditions
- Received
- 14 Aug 2026
- Validated
- 14 Aug 2026
- Decided
- 9 Oct 2026
- Ward
- Hulton
- Postcode
- BL5 1FJ
Timeline
Dates from the published record
-
14 Aug 2026
Received by Bolton
-
17 Aug 2026
Added to PlanIndex
-
9 Oct 2026
Decision issued: Approve subject to conditions
-
9 Oct 2026
Status changed to Decided
Previously Deposited.
Documents
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- comments national grid
- Neighbour Consultation Plan
- Neighbour Consultation Plan
- APPLICATION FORM REDACTED
- SITE LOCATION PLAN
- PRODUCT INFORMATION - STANDARD INVERTER HEAT PUMP
- AIR CONDITIONING PRODUCT INFORMATION
- BLOCK PLAN
- EXISTING PART PLAN & ELEVATIONS
- PROPOSED PART PLAN & ELEVATIONS
- AIR CONDITIONING SERVICE MANUAL
- NOISE IMPACT ASSESSMENT
- COVER LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bolton granted permission on 9 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Bolton's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Amazon UK Plot E1 Logistics North Bridgewater Avenue Bolton
INSTALLATION OF ROOF MOUNTED SOLAR PHOTOVOLTAIC PANELS (SITE COVERAGE 2.51HA) WITH AN OUTPUT OF APPROXIMATELY 3.3MW
Withdrawn Full applications 9 docs -
Unit E2 Bridgewater Avenue Bolton BL5 1EE
RETROSPECTIVE PLANNING CONSENT FOR THE ERECTION OF CANOPY OVER YARD AREA, SPRINKLER TANKS AND PUMP HOUSE INCLUDING FENCE ENCLOSURE, BOUNDARY FENCING AND RECYCLING STORAGE, SMOKING SHELTER, FENCING OF THE REFUELING AREA, INSTALLATION OF TURNSTILE AND FLUE TOGETHER WITH INTERNAL ALTERATIONS TO EXTEND OFFICE AREA.
Granted Full applications 13 docsSmall domestic -
Plot F2H Bridgewater Avenue Bolton BL5 1BT
DISCHARGE OF PLANNING CONDITIONS: 16 (PRELIMINARY RISK ASSESSMENT), 18 (COAL MINING MITIGATION STRATEGY), 22 (ASSESSMENT OF BAT USE) AND 30 (SURFACE WATER DRAINAGE SCHEME) ATTACHED TO PLANNING PERMISSION 90539/13
Decided Conditions 13 docs -
Unit D1 Bridgewater Avenue Bolton BL5 1EE
82% historically approved · decision due ~2 Dec
INSTALLATION OF 2NO. BATTERY STORAGE UNITS
Awaiting decision -
Unit D1 Bridgewater Avenue Bolton BL5 1EE
82% historically approved · decision due ~18 Nov
PRIOR APPROVAL FOR THE INSTALLATION OF SOLAR PANELS TO THE ROOF OF BUILDING
Awaiting decision 11 docs