Skip to content
PlanIndex Get alerts
Menu

Planning application

37 Salterton Drive Bolton BL3 3RG

Granted Bolton 00928/26

Works: Extension Loft or dormer Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF SINGLE STOREY FRONT, REAR AND FIRST FLOOR SIDE EXTENSION TOGETHER WITH REAR DORMER.

As published by the council, reference 00928/26

Application record

Reference
00928/26
Status
Decided
Decision
Approve subject to conditions
Received
21 May 2026
Validated
21 May 2026
Decided
7 Aug 2026
Ward
Hulton
Postcode
BL3 3RG

Timeline

Dates from the published record

  1. 21 May 2026

    Received by Bolton

  2. 21 Jul 2026

    Added to PlanIndex

  3. 7 Aug 2026

    Decision issued: Approve subject to conditions

Who's behind it

Company information only, from the register and Companies House

MOJO Architects Agent, an architecture practice

11 applications on PlanIndex · across 6 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • Decision Notice Decision · 07 Aug 2026
  • Officer Report Officer Report · 07 Aug 2026
  • Existing and Proposed Site Plan Drawing · 09 Jul 2026
  • EXISTING PROPOSED SITE PLAN Amended Drawing · 07 Jul 2026
  • APPLICATION FORM REDACTED Application Form · 21 May 2026
  • LOCATION PLAN Application Submission Details · 21 May 2026
  • FULL PLANS Application Submission Details · 21 May 2026
  • PROPOSED SITE PLAN Application Submission Details · 21 May 2026
  • PLANNING STATEMENT Application Submission Details · 21 May 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Bolton granted permission on 7 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Bolton's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 28 Salterton Drive Bolton BL3 3RG

    07156/19 Submitted 21 Oct 2019 56m away

    ERECTION OF DORMER TO REAR AND INCREASE TO RIDGE HEIGHT

    Granted Full applications Loft or dormer Roofing 7 docs
  • 9 Caterham Avenue Bolton BL3 3RF

    14768/22 Submitted 7 Oct 2022 87m away

    DEMOLITION OF EXISTING GARAGE WITH THE ERECTION OF TWO STOREY EXTENSION TO FRONT AND SIDE.

    Granted Full applications Extension Demolition 4 docs
  • 59 Fenton Way Bolton BL3 3GN

    00754/26 Submitted 24 Apr 2026 122m away

    ERECTION OF SINGLE STOREY REAR EXTENSION.

    Granted Householder Extension 4 docs
    Small domestic
  • 21 Sonning Drive Bolton BL3 3RA

    18582/24 Submitted 8 Jul 2024 152m away

    RETROSPECTIVE CONSENT FOR RAISING THE ROOF TO CONSTRUCT A SECOND FLOOR AT THE REAR

    Refused Householder 9 docs
    Domestic
  • 2 Stonehaven Bolton BL3 4UW

    15122/22 Submitted 7 Dec 2022 192m away

    DEMOLITION OF EXISTING CONSERVATORY TO REAR TOGETHER WITH ERECTION OF SINGLE STOREY EXTENSION TO SIDE AND REAR

    Granted Full applications Extension Demolition 4 docs
    Small domestic
  • Land South Of Windyhill Drive Windyhill Drive Bolton BL3 4TH

    00431/26 Submitted 9 Mar 2026 229m away

    79% historically approved · decision due ~4 May

    ERECTION OF 49 NO. DWELLINGS TOGETHER WITH VEHICULAR AND PEDESTRIAN ACCESS, FOOTWAYS, LANDSCAPING, AND CAR PARKING.

    Awaiting decision Full applications 84 docs
    Major scheme