Skip to content
PlanIndex Get alerts
Menu

Planning application

Coleman Milne Ltd Colmil Works Wigan Road Westhoughton Bolton BL5 2EE

Awaiting decision Bolton 00924/26

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

ERECTION OF 1 NO. TEMPORARY ANCILLARY BUILDING

As published by the council, reference 00924/26

Application record

Reference
00924/26
Status
Awaiting decision
Received
20 May 2026
Validated
4 Jun 2026
Ward
Westhoughton South
Parish
Westhoughton Town Council
Postcode
BL5 2EE

Timeline

Dates from the published record

  1. 20 May 2026

    Received by Bolton

  2. 4 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. 14 Aug 2026

    Status changed to Awaiting decision

    Previously Deposited.

  5. Decision

    Awaiting decision

    Decision expected by 30 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Bolton took a median of 59 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

  • National Gas Transmission Consultee Comment · 30 Jul 2026
  • Environmental Health Consultee Comment · 22 Jul 2026
  • Westhoughton TC Comments Consultee Comment · 14 Jul 2026
  • SITE NOTICE OF DEVELOPMENT PROPOSALS Other · 08 Jul 2026
  • Greater Manchester Ecology Unit Consultee Comment · 25 Jun 2026
  • . Flood Risk Team. Consultee Comment · 23 Jun 2026
  • Highways Engineering Consultee Comment · 05 Jun 2026
  • PROPOSED PLANS Amended Drawing · 04 Jun 2026
  • SUPPORTING STATEMENT Application Submission Details · 04 Jun 2026
  • Neighbour Consultation Plan Other · 04 Jun 2026
  • APPLICATION FORM REDACTED Application Form · 20 May 2026
  • LOCATION PLAN Application Submission Details · 20 May 2026
  • PROPOSED SITE PLAN Application Submission Details · 20 May 2026
  • EXISTING SITE PLAN Application Submission Details · 20 May 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Bolton for determination, against a statutory target of eight weeks. Over the last year Bolton's median decision took 59 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Bolton's portal will say. Our guide explains the common types.

Nearby applications

Within 500 metres

  • 495 Wigan Road Westhoughton Bolton BL5 2BX

    15518/23 Submitted 26 Feb 2023 115m away

    ERECTION OF SINGLE STOREY EXTENSION TO REAR

    Granted Full applications Extension 29 docs
    Small domestic
  • 49 Wearish Lane Westhoughton Bolton BL5 2AX

    18784/24 Submitted 12 Aug 2024 428m away

    ERECTION OF A TWO-STOREY FRONT AND SIDE EXTENSION, INCLUDING THE REMOVAL OF THE EXISTING GARAGE AND CONSTRUCTION OF A NEW TWO-STOREY EXTENSION IN ITS PLACE, A SINGLE-STOREY REAR EXTENSION, INSTALLATION OF SOLAR PANELS AT THE REAR, AND NEW FACING BRICKWORK

    Granted Householder Extension 10 docs
    Small domestic
  • Westhoughton Equestrian Centre Wigan Road Westhoughton Bolton BL5 2DD

    11017/21 Submitted 12 Apr 2021 472m away

    DISCHARGE OF CONDITIONS 2 (CONSTRUCTION METHOD STATEMENT), 3 (TREE FENCING), 4 (VERIFICATION REPORT/INTRUSIVE SITE INVESTIGATION), 5 (ARBORICULTURAL METHOD STATEMENT) , 6 (RAILWAY-EXCAVATION/EARTHWORKS), AND9 (i) (CONTAMINATION METHODOLOGY) ON APPLICATION 07224/19

    Decided Conditions Trees 12 docs
  • 6 Bellwood Westhoughton Bolton BL5 2RT

    00745/26 Submitted 23 Apr 2026 478m away

    DEMOLITION OF EXISTING GARAGE AND CONSERVATORY TOGETHER WITH ERECTION OF SINGLE STOREY FRONT, SIDE AND REAR EXTENSION.

    Granted Householder Extension Demolition 5 docs
    Small domestic
  • Westhoughton Equestrian Centre Wigan Road Westhoughton Bolton BL5 2DD

    12549/21 Submitted 3 Nov 2021 486m away

    DISCHARGE OF CONDITIONS 2 (CONSTRUCTION METHOD STATEMENT), 3 (BROOK AND TREES FENCING), 4 (ARBORICULTURAL METHOD STATEMENT), 5 (VERIFICATION REPORT), 6 (BAT BOXES), 7 (DRAINAGE), 8 (NON NATIVE SPECIES), 9 (CONTAMINATION METHODOLOGY), 10 (BAT SURVEY WITHIN TREES), 11 (MATERIALS) ON APPLICATION 11494/21

    Decided Conditions Trees 22 docs