Planning application
00906/26
120 Parkfield Road Bolton BL3 2BE
Proposal
INSTALLATION OF 1 NO. EXTRACTOR FLUE.
As published by the council, reference 00906/26
Timeline
Dates from the published record
-
18 May 2026
Received by Bolton
-
19 May 2026
Validated
Checked as complete and ready for consideration.
-
14 Jul 2026
Decision issued: Refused
-
21 Jul 2026
Added to PlanIndex
What refusal means
The process from here
The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.
Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
15113/22 Granted
166 Parkfield Road Bolton BL3 2BG
ERECTION OF SINGLE STOREY EXTENSION TO REAR
-
01119/26 Awaiting decision
19 Forester Hill Avenue Bolton BL3 2DR
ERECTION OF A PART SINGLE/PART TWO STOREY SIDE AND REAR EXTENSION
-
14188/22 Granted
Former Football Pitch Claymore Street / Arlington Street Bolton BL3 2SQ
PRUNING OF 3NO. LONDON PLANE TREES
-
18856/24 Granted
25 Woodfield Street Bolton BL3 2HD
ERECTION OF A SINGLE STOREY REAR EXTENSION
-
00633/26 Awaiting decision
Nightingale Community Centre Rishton Lane Bolton BL3 2BN
REFURBISHMENT OF VACANT COMMUNITY CENTRE FOR TEACHING, COMMUNITY AND RELIGIOUS USE (SUI GENERIS) WITH ERECTION OF SINGLE STOREY REAR EXTENSION AND MEZZANINE FLOOR TOGETHER WITH ONSITE PARKING PROVISION AND TRAFFIC CIRCULATION AND CONTINUED USE OF 2 NO. TEMPORARY MODULAR CABINS
-
01042/26 Awaiting decision
95 Crescent Road Bolton BL3 2JS
ERECTION OF FIRST FLOOR REAR EXTENSION
Other full applications applications
In Bolton
-
00737/26 Refused
Rear Of 35 Harrowby Street Bolton BL4 7BR
RETROSPECTIVE APPLICATION FOR REPLACEMENT ROOF AND WIDENING OF EXISTING FRONT ACCESS.
-
21402/25 Refused
All Saints Ukrainian Church All Saints Street Bolton BL1 2BQ
CHANGE OF USE FROM VACANT GRADE II LISTED CHURCH (CLASS F) TO OFFICE DEVELOPMENT TO ACCOMMODATE 7 NO. OFFICE SUITES, CONFERENCE FACILITIES (CLASS E) TOGETHER WITH INSTALLATION OF NEW ENTRANCE GATE TO A 10 BAY PARKING AREA AND ENTRANCE PORCH TO BE REINSTATED TO ITS ORIGINAL FORM.
-
01359/26 Awaiting decision
Ratcliffes Farm Wingates Lane Bolton BL5 3LT
DEMOLITION OF EXISTING OUTBUILDINGS AND RURAL STRUCTURES TOGETHER WITH ERECTION OF 1 NO. DWELLING
-
00761/26 Granted
Christ Church Chorley New Road Bolton BL1 5AH
REPLACEMENT OF ROOF LIGHTS TO VESTRY WITH NEW ROOF COVERING TO VESTRY AND CANOPY OVER EXTERNAL VESTRY DOOR
-
00624/26 Granted
Lynstock House, Prinwest Ltd Lynstock Way Bolton BL6 4SA
ERECTION OF A SIDE EXTENSION TO EXISTING INDUSTRIAL UNIT