Planning application
Brinsop House Farm Chorley Road Bolton BL5 3NH
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
CONVERSION OF EXISTING BARN INTO 3 NO. DWELLINGS
As published by the council, reference 00538/26
Application record
- Reference
- 00538/26
- Status
- Decided
- Decision
- Granted As published: Approve subject to conditions
- Received
- 24 Mar 2026
- Validated
- 30 Mar 2026
- Decided
- 30 Oct 2026
- Ward
- Westhoughton North & Hunger Hill
- Parish
- Westhoughton Town Council
- Postcode
- BL5 3NH
Timeline
Dates from the published record
-
24 Mar 2026
Received by Bolton
-
30 Mar 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
-
30 Oct 2026
Decision issued: Approve subject to conditions
-
30 Oct 2026
Status changed to Decided
Previously Deposited.
Related applications
Cases linked to this one on the register
- Application: 20658/25
Documents
Plans, drawings, consultee responses and the officer's report
31 documents on file for this application
- Proposed Site Plan
- APPLICATION FORM REDACTED
- Neighbour Consultation Plan
- Environmental Health
- Press Advert
- Design for Security
- Greater Manchester Ecology Unit
- COAL AUTHORITY
- HOUSING STANDARDS TEAM
- FLOOD RISK TEAM.
- Highways Engineering
- SELF BUILD/CUSTOM HOUSE STATEMENT
- PROPOSED LOCATION PLAN
- EXISTING LOCATION PLAN
- PROPOSED SITE PLAN
- EXISTING SITE PLAN
- SECTIONS
- PROPOSED ELEVATIONS
- PROPOSED FLOOR PLAN
- EXISTING FLOOR PLAN
- EXISTING ELEVATIONS
- PUBLIC RIGHT OF WAY TEAM
- PUBLIC RIGHT OF WAY TEAM
- HABITAT SURVEY
- ECOLOGICAL IMPACT ASSESSMENT
- ARBORICULTURAL IMPACT ASSESSMENT
- SUSTAINABILITY - CARBON AND ENERGY STATEMENT
- DESIGN AND ACCESS STATEMENT
- GREENBELT JUSTIFICATION STATEMENT
- LANDSCAPE AND VISUAL IMPACT ASSESSMENT
- RESIDENTIAL STANDARDS STATEMENT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Bolton granted permission on 30 October 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About this record
The published feed does not state which type of application this is; the register entry on Bolton's portal will say. Our guide explains the common types.