Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0281

151A MOWBRAY DRIVE, BLACKPOOL, FY3 7UN

Awaiting decision Blackpool Cert. of Lawful Use (Proposed)

Proposal

Use of premises (Unit A) as a martial arts training facility (Use Class E(d)). (Certificate Lawfulness Proposed)

As published by the council, reference 26/0281

Timeline

Dates from the published record

  1. 15 May 2026

    Received by Blackpool

  2. 19 May 2026

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Blackpool for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About lawful development applications

How this application type works

A lawful development certificate is a legal determination, not a planning judgement. It asks the council to confirm either that existing use or works are lawful, often through the passage of time, or that a proposal would not need planning permission at all. The applicant must prove the facts; the merits of the scheme are not considered.

More on lawful development applications in our guide

Nearby applications

Within 500 metres

  • 26/0241 Awaiting decision

    10 WAREHAM ROAD, BLACKPOOL, FY3 7XG

    Creation of car wash bay enclosed on three sides by 2m high screen to front of building and use of site as a mixed use comprising storage and distribution and car wash service (sui generis).

    1 May 2026 159m away Full applications
  • 26/0352 Granted

    26 POULTON OLD ROAD, BLACKPOOL, FY3 7LB

    Non-material amendment to planning application 25/0564 to allow the installation of a window to west elevation

    29 Jun 2026 171m away Amendments
  • 26/0277 Granted

    60 POULTON OLD ROAD, BLACKPOOL, FY3 7LB

    Use of property as a single private dwelling house.

    13 May 2026 171m away Full applications
  • 25/0690 Awaiting decision

    50 BISPHAM ROAD, BLACKPOOL, FY2 0SX

    Erection of a part 3 storey and part 4 storey building comprising of 12no self contained flats with associated car parking, landscaping and boundary treatments.

    25 Sep 2025 449m away Full applications

In Blackpool

  • 26/0379 Awaiting decision

    15 GLEN STREET, BLACKPOOL, FY3 9EX

    Retention of a 4 person use class C4 small House in Multiple Occupation (HMO) (Ceritifate of Lawfulness Existing)

    15 Jul 2026 Lawful development
  • 26/0303 Granted

    12 & 12A LINCOLN ROAD, BLACKPOOL, FY1 4HB

    Use of premises as two self-contained permanent residential flats. (Certificate of Lawfulness Existing)

    4 Jun 2026 Lawful development
  • 26/0301 Granted

    5 GLENFIELD AVENUE, BLACKPOOL, FY2 0DB

    Single storey rear extension 3m from rear elevation

    2 Jun 2026 Lawful development
  • 26/0289 Refused

    HARRISONS FARM, OFF MIDGELAND ROAD, BLACKPOOL, FY4 5EE

    Erection of single storey side extension

    21 May 2026 Lawful development
  • 26/0295 Granted

    FIRST FLOOR SENECA HOUSE, LINKS POINT, AMY JOHNSON WAY, BLACKPOOL, FY4 2FF

    Use of some of the first floor office space as ancillary storage of electronic sensors. The premises extend to approximately 696.64 m2 in total. The principal use is office-based where we create 3D Bim models, 2D Cad floor plans and capacity reports, occupying approximately 638.62 m2. A secondary room of approximately 58.02 m2 would be used to store sensors owned and operated by the business in connection with its office activities. No manufacturing, processing, or repair of sensors would take place on the premises. Sensors would be stored awaiting deployment to client sites. Deliveries would be infrequent and isolated to specific projects. Around 180 sensors would be stored. There would typically be 2/3 projects a year and 4-5 deliveries would typically take place by a courier over a 3 month period for each project. In between projects we expect to hold very little stock. No heavy goods vehicles would attend the site. No machinery would be installed. The premises operate between 9 - 5 pm Monday to Friday, with no out-of-hours activity. The storage would be entirely ancillary and subordinate to the primary office use, constituting 8.33% of the total floor area. The business would not operate the storage independently of the office function.

    28 May 2026 Lawful development