Skip to content
PlanIndex Get alerts
Menu

Planning application

8 Ainsdale Drive Darwen BB3 2EQ

Granted Blackburn with Darwen 10/26/0311 Full Planning Application

Works: Extension Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed porch, installation of new window and door to the southern gable elevation and patio doors to the rear elevation replacing an existing bedroom window

As published by the council, reference 10/26/0311

Application record

Reference
10/26/0311
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
30 Mar 2026
Validated
1 Apr 2026
Decided
18 May 2026
Ward
West Pennine, Whitehall
Parish
Darwen
Decision by
Delegated
Postcode
BB3 2EQ

Timeline

Dates from the published record

  1. 30 Mar 2026

    Received by Blackburn with Darwen

  2. 1 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 18 May 2026

    Decision issued: Permits

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

16 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 9 Juniper Grove Livesey Blackburn BB2 5FX

    10/25/0980 Submitted 22 Sep 2025 76m away

    13m meter steel Railing / fence to separate our border from the public footpath (Retrospective)

    Withdrawn Full applications
    Small domestic
  • 11 Juniper Grove Livesey Blackburn BB2 5FX

    10/26/0305 Submitted 27 Mar 2026 105m away

    96% historically approved · decision due ~25 May

    Erection of replacement rear boundary fence and alterations to rear garden levels to level the ground (part retrospective)

    Awaiting decision Full applications 9 docs
    Small domestic
  • Brokenstone Road Blackburn BB3 0LL

    10/18/1116 Submitted 19 Nov 2018 341m away

    Hybrid planning application seeking full planning permission for remediation and means of access, along with outline planning permission (with all matters reserved except access) for redevelopment of the site to include over 28ha of open space, paddocks and landscaping and up to 450 residential units (use class C3), along with any ancillary parking, amenity, and all other associated public, semi public and private realm, soft/hard landscaping, infrastructure and highway works, access and a new internal road network connecting with the existing road network.

    Granted Outline 58 docs
  • 14 Cloudberry Curve Livesey Blackburn BB2 5DY

    10/23/0234 Submitted 23 Mar 2023 344m away

    Single storey rear extension

    Granted Full applications Extension 11 docs
    Small domestic
  • The Sycamores Gib Lane Blackburn BB2 5BP

    10/19/1168 Submitted 29 Nov 2019 372m away

    Non Material Amendment pursuant to planning application 10/17/1131 "Variation of Condition No.24 relating to drainage layout and proposed finished floor levels pursuant to planning application 10/17/0211 "Erection of 205 No. dwellings, access, landscaping, and associated works" - to amend the orientation of plot no. 185.

    Granted Amendments 4 docs
    Major scheme
  • Land West of Gib Lane Blackburn

    10/23/0144 Submitted 21 Feb 2023 372m away

    Non material amendment pursuant to planning application 10/19/0755 "Variation of Conditions 2, 3, 5, 7, 12, 14, 16, 17 and 18 to reflect compliance and the Variation of Condition No.24 relating to drainage layout and proposed finished floor levels pursuant to planning applications 10/17/1131 & 10/17/0211" - Amendments to house types at plots 88 and 89 and reposition of dwelling at plot 64

    Granted Amendments 7 docs
    Domestic

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications