Planning application
Turning Head off Whalley old Road Blackburn BB1 5QL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of redundant turning head and pavements to be replaced with mixed landscaping and pedestrian access improvements (Regulation 3).
As published by the council, reference 10/26/0307
Application record
- Reference
- 10/26/0307
- Type
- Full Planning Application (Regulation 3)
- Status
- FINAL DECISION
- Decision
- Permits
- Received
- 26 Mar 2026
- Validated
- 1 Apr 2026
- Decided
- 29 May 2026
- Ward
- Little Harwood & Whitebirk
- Parish
- Blackburn
- Decision by
- Planning and Highways Committee
- Postcode
- BB1 5QL
Timeline
Dates from the published record
-
26 Mar 2026
Received by Blackburn with Darwen
-
1 Apr 2026
Validated
Checked as complete and ready for consideration.
-
29 May 2026
Decision issued: Permits
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
12 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Land at Whalley Old Road (located to the East of the existing bus turning area), and directly serving the new Vistry/Bovis housing development (currently under phased construction) Blackburn
97% historically approved · decision due ~3 Aug
The construction of a new 4-arm roundabout - the Eastern and Western arms will re-align the existing Whalley Old Road, the Northern arm will serve the future North East Blackburn Development and the Southern arm will serve the adjacent housing site which is currently under construction - and widening and drainage works to the existing access road to the north of Whalley Old Road
Awaiting decision Lawful development 4 docs -
Blackburn Chemicals Ltd Cunliffe Road Blackburn BB1 5SX
Proposed warehouse extension to existing industrial unit (use class B2/B8) and erection of 2 silos for storage
Granted Full applications Extension 23 docs -
Blackburn Chemicals Ltd Cunliffe Road Blackburn BB1 5SX
Construction of 2No. warehouse and storage units (B8)
Granted Full applications 13 docs -
Land to the South of Whalley Old Road Blackburn
Non-material amendment pursuant to planning application 10/24/1067 "Variation of Condition Nos 1 "approved site layout", 2 "approved boundary treatment" 3 "acoustic bund" 4 "approved detailed landscape plan" and 8 "acoustic mitigation measures" pursuant to planning application 10/22/0722 "Reserved Matters Application (Regulation 4) for Approval of the reserved matters for the access, appearance, landscaping, layout and scale for the erection of 165 dwellings pursuant to outline application 10/20/0716" supplemented by non-material amendment application 10/24/0888 " amend description to "Approval of the reserved matters for the access, appearance, landscaping, layout and scale for the erection of up to 165 dwellings pursuant to outline application 10/20/0716" - number of plots reduced from 165 to 161; reposition plots in south east corner away from embankment; reposition substation; realignment of the PROW in the eastern POS; remove the sustainable drainage basin (SUDs) to the south; increase the size of the remaining SUDs and provide additional on-site surface water storage to the rest of the on-site drainage system; regrading of the eastern POS to provide PROW platform and more uniform gradient access across the POS" - substitution of housetypes from 'Rowan' to 'Hazel' on Plots 79-82, 97, 113, 116, 119, 120, 137 & 140-142 with adjustments to roof designs
Granted Amendments 5 docsMajor scheme -
508 Whalley Old Road Blackburn BB1 5QL
Proposed demolition of existing conservatory, construction of a single storey rear extension and two storey side extension. Roof lift to accommodate first floor, side dormers and external alterations
Granted Full applications Extension Loft or dormer +1 8 docsSmall domestic -
Site adjacent Croft Head Road and Cunliffe Road Blackburn BB1 5TB
Erection of an industrial building containing 3.no units (use class B2/B8/trade counter) and associated external works
Granted Full applications 33 docsSeveral homes
Other full applications applications
In Blackburn with Darwen
-
10/26/0360 Granted
Spout House Farm Bog Height Road Darwen BB3 0LF
Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations
-
10/26/0349 Granted
31 King William Street Blackburn BB1 7DJ
Installation of defibrillator and bleed kit cabinets to external wall
-
10/26/0332 Granted
30 Cleveleys Road Blackburn BB2 3JS
Proposed single storey side extension, detached garage and larger front porch
-
10/26/0529 Awaiting decision
Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX
Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling
-
10/26/0381 Granted
20 Mollington Road Blackburn BB2 6EG
Proposed single storey side/rear extension and front porch