Planning application
Sough Works Sough Road Darwen BB3 2TS
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Discharge Condition No.12 "validation report" pursuant to planning application 10/24/0463
As published by the council, reference 10/26/0144
Application record
- Reference
- 10/26/0144
- Type
- Discharge of planning condition
- Status
- Granted As published: FINAL DECISION
- Decision
- Granted As published: Permits
- Received
- 18 Feb 2026
- Validated
- 23 Feb 2026
- Ward
- Darwen South
- Parish
- Darwen
- Decision by
- Delegated
- Postcode
- BB3 2TS
Site history
Applications at this address on the Blackburn with Darwen register
This site has had 3 applications since 2024: 2 approved, 0 refused.
-
10/25/1221 Withdrawn
Sough Works Sough Road Darwen BB3 2TS
Discharge Condition No 11 "remediation validation strategy" pursuant to planning application 10/24/0463
-
10/24/0463 Granted
Sough Works Sough Road Darwen BB3 2TS
Erection of Employment Building (Class B8) with associated car parking and external works
Timeline
Dates from the published record
-
18 Feb 2026
Received by Blackburn with Darwen
-
23 Feb 2026
Validated
Checked as complete and ready for consideration.
-
21 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Blackburn with Darwen granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Sough Works Sough Road Darwen BB3 2TS
Erection of Employment Building (Class B8) with associated car parking and external works
Granted Full applications 40 docs -
Sough Rd Darwen Lancs BB3 2TS
Replace existing boundary wall of site fronting Sough Rd & creation of new access, removing 2 drop kerbs.
Granted Full applications 29 docsSmall domestic -
Sough Works Sough Road Darwen BB3 2TS
Discharge Condition No 11 "remediation validation strategy" pursuant to planning application 10/24/0463
Withdrawn Conditions 4 docs -
Darwen Delivery Office Sough Road Darwen BB3 2FX
Various advertisements including fascia signs and car park signage
Granted Advertising 9 docs -
17 Prince Lee Meadows Darwen BB3 2BQ
T1 Oak - Crown Raise secondary branches up to 5m. Crown Reduce large limb towards the property by 2m back to a suitable growing point.
Granted Trees 6 docs -
Other condition discharge and variation applications
In Blackburn with Darwen
-
10/26/0482 Granted
Temple Farm Bury Road Edgworth Bolton BL7 0BT
Discharge Condition No.16 "bat licence/statement " pursuant to planning application 10/26/0086
-
10/26/0299 Granted
Stocks Farm Carr Lane Blackburn BB2 6QT
Discharge Condition Nos 3 "materials", 4 "sustainable surface drainage system and foul water drainage scheme", 5 "construction and environmental management plan scheme", 6 "boundary treatment", 7 "landscaping scheme", and 8 "bat and bird boxes scheme" pursuant to planning application 10/25/0798
-
10/26/0530 Awaiting decision
Whowells Farm Broadhead Road Turton Bolton BL7 0JJ
Discharge Condition No.3 "landscaping scheme" pursuant to planning application 10/26/0209
-
10/26/0429 Granted
Cloud Exotic Bright Street Darwen BB3 1QL
Discharge Condition No.9 " vehicular access barrier to side of building scheme" pursuant to planning application 10/25/1113
-
10/26/0405 Granted
Land at Poole St Blackburn
Discharge Condition Nos 3 "materials", 4 "foul and surface water drainage scheme", 5 "sustainable drainage management and maintenance plan", 6 "desk study" and 9 "Construction Environmental Management Plan scheme" pursuant to planning application 10/25/0123