Skip to content
PlanIndex Get alerts
Menu

Planning application

Higher Barn Horden Farm Broken Stone Road Blackburn BB2 5JP

Granted Blackburn with Darwen 10/26/0072 Application to undertake works to protected trees

Works: Trees

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Fell 2no. trees to allow for the installation of underground cables

As published by the council, reference 10/26/0072

Application record

Reference
10/26/0072
Type
Application to undertake works to protected trees
Status
FINAL DECISION
Decision
Grant
Received
26 Jan 2026
Validated
5 Feb 2026
Decided
5 Feb 2026
Ward
Livesey With Pleasington
Parish
Livesey
Decision by
Delegated
Postcode
BB2 5JP

Timeline

Dates from the published record

  1. 26 Jan 2026

    Received by Blackburn with Darwen

  2. 5 Feb 2026

    Validated

    Checked as complete and ready for consideration.

  3. 5 Feb 2026

    Decision issued: Grant

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Blackburn with Darwen granted permission on 5 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About tree works applications

Applications for works to trees cover protected trees: consent under a tree preservation order, or six weeks notice for trees in a conservation area. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land off Livesey Branch Road/Moorland Drive Blackburn

    10/21/0369 Submitted 8 Apr 2021 129m away

    Erection of 2 additional dwellings within the existing housing development - Plots 186 & 187

    Granted Full applications 12 docs
  • Land off Livesey Branch Road Blackburn

    10/19/1190 Submitted 6 Dec 2019 129m away

    Erection of 8 additional dwellings within the existing housing development

    Granted Full applications 13 docs
  • Land off Livesey Branch Road Blackburn

    10/21/0642 Submitted 16 Jun 2021 129m away

    Non material amendment pursuant to planning application 10/19/1176 "Erection of 9 additional dwellings within the existing housing development" - to reposition the garages to plots 174 and 175 to be set further back on the plots and the handing of plot 175 - replace drawing nos: BB03_SP(90)02 rev A and BB03_SP(90)04 with BB03_SP(90) 02 rev B

    Granted Amendments 5 docs
  • Land off Moorland Drive Blackburn

    10/23/0168 Submitted 27 Feb 2023 129m away

    Non material amendment pursuant to planning application 10/21/0343 to amend finished floor levels on Phase 6 and amend the Weaver 4 House Type on Plots 20 and 22 of Phase 4 and amendments to plots 137 and 138.

    Granted Amendments 10 docs
    Several homes
  • Land off Moorland Drive Blackburn

    10/26/0098 Submitted 4 Feb 2026 173m away

    Non-material amendment pursuant to planning application 10/21/0343 "Variation of Condition No.2 pursuant to Hybrid planning application 10/19/0662 seeking 'full planning permission for residential development of 155 dwellings and outline planning permission with all matters reserved except for access for residential development for up to 280 dwellings' - to amend site layout and make plot substitutions " - phase 5 amendments: plot 85 change from Steading 4 house type to Forge 4; plot 86 change from Farmhouse 3 to Farmhouse 4; plot 82 change from Byre 5 to Byre 4; Plot 80 garage added to Byre 4; Plot 79 change from Thresher 3 to Byre 5 with double garage; Plot 89 change from Farmhouse 5 to Farmhouse 6; Plot 71 change from Weaver 4 to Weaver 5; Plots 72 and 90 chimneys removed; Plot 83 add additional parking space; Phase 6 amendments: Plot 102 change from Weaver 4 to Weaver 5.

    Granted Amendments New dwelling 5 docs
    Major scheme
  • Brokenstone Road Blackburn BB3 0LL

    10/18/1116 Submitted 19 Nov 2018 214m away

    Hybrid planning application seeking full planning permission for remediation and means of access, along with outline planning permission (with all matters reserved except access) for redevelopment of the site to include over 28ha of open space, paddocks and landscaping and up to 450 residential units (use class C3), along with any ancillary parking, amenity, and all other associated public, semi public and private realm, soft/hard landscaping, infrastructure and highway works, access and a new internal road network connecting with the existing road network.

    Granted Outline 58 docs

In Blackburn with Darwen

  • 10/26/0499 Granted

    Griffin Lodge Cavendish Place Blackburn

    T1 Unknown Dead <10U T3 Silver Birch Dead <10U T4 Sycamore Poor <10U T12 Common Ash Moribund <10U T19 Common Hawthorn Dead <10U T21 Common Ash Poor <10U G6 Unknown Dead <10U G25 Approx 8no Common Ash Moribund/Dead <10U Fell the above

    28 May 2026 Trees
  • 10/26/0484 Granted

    4 Dukes Brow Blackburn BB2 6EX

    T1 silver birch - fell

    25 May 2026 Trees
  • 10/26/0473 Granted

    Longacre Billinge End Road Blackburn BB2 6PT

    T3 (sycamore) - 2m lateral reduction and 1no lateral removed T4 (sycamore) - 2m lateral reduction

    20 May 2026 Trees
  • 10/26/0464 Granted

    Mossfield Pleasington Lane Pleasington Blackburn BB2 5JH

    T934 (Sycamore) - Fell T940 (Sycamore) - Fell

    18 May 2026 Trees
  • 10/26/0430 Granted

    Butlers Arms, Flat At Pleasington Lane Pleasington Blackburn BB2 5JH

    T1 (Willow) - Fell

    6 May 2026 Trees