Planning application
40 Burlington Street Blackburn BB2 6ES
Works: Loft or dormer
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Construction of rear dormer
As published by the council, reference 10/26/0036
Application record
- Reference
- 10/26/0036
- Type
- Certificate of Lawfulness (Proposed)
- Status
- FINAL DECISION
- Decision
- Grant
- Received
- 13 Jan 2026
- Validated
- 21 Jan 2026
- Decided
- 26 Feb 2026
- Ward
- Wensley Fold
- Parish
- Blackburn
- Decision by
- Delegated
- Postcode
- BB2 6ES
Timeline
Dates from the published record
-
13 Jan 2026
Received by Blackburn with Darwen
-
21 Jan 2026
Validated
Checked as complete and ready for consideration.
-
26 Feb 2026
Decision issued: Grant
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Blackburn with Darwen granted permission on 26 February 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About lawful development applications
A lawful development certificate is a legal determination that existing or proposed works do not need planning permission; the merits of the scheme are not considered. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
38 Burlington Street Blackburn BB2 6ES
Erection of single storey extension to rear. 3.8m & 3.9m from original rear wall, Max Height: 3.650m, Height to Eaves: 2.4m.
Granted Householder Extension 5 docsSmall domestic -
29 Burlington Street Blackburn BB2 6EF
Proposed conversion of dwelling to the self contained flats, together with a ground floor rear extension.
Granted Full applications New dwelling Extension 35 docsDomestic -
Small domestic
-
-
40 Adelaide Terrace Blackburn BB2 6ET
Felling of one tree in front garden and one in back garden
Granted Trees 6 docs -
5 Leamington Close Blackburn BB2 6AZ
Proposed 2nd floor front & rear dormers
Granted Full applications Loft or dormer 17 docs
Other lawful development applications
In Blackburn with Darwen
-
10/26/0402 Granted
The Nook 1 Hill Street Edgworth Bolton BL7 0BF
Conversion of garage to habitable room
-
10/26/0517 Awaiting decision
Unit 8 Arkwright Court Commercial Road Blackburn Interchange J4/M65 Darwen BB3 0FG
Use of property as Aesthetics Medical Facility (Use Class E(e))
-
10/26/0515 Awaiting decision
Land at Whalley Old Road (located to the East of the existing bus turning area), and directly serving the new Vistry/Bovis housing development (currently under phased construction) Blackburn
The construction of a new 4-arm roundabout - the Eastern and Western arms will re-align the existing Whalley Old Road, the Northern arm will serve the future North East Blackburn Development and the Southern arm will serve the adjacent housing site which is currently under construction - and widening and drainage works to the existing access road to the north of Whalley Old Road
-
10/26/0511 Awaiting decision
12 Bentham Road Blackburn BB2 4PN
Use of property by the Ministry of Justice's Probation Accommodation Programme for up to three adults (Use Class C2)
-
10/26/0296 Granted
Chingles Tockholes Road Tockholes Darwen BB3 0LU
Erection of larger rear dormer replacing existing rear dormer extension