Planning application
Land adjacent to Newlands 61 Manor Road Darwen BB3 2SN
Works: New dwelling Domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 1No. self-build dwelling (Use Class C3)
As published by the council, reference 10/26/0009
Application record
- Reference
- 10/26/0009
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Permits
- Received
- 6 Jan 2026
- Validated
- 20 Jan 2026
- Decided
- 29 May 2026
- Ward
- Darwen West
- Parish
- Darwen
- Decision by
- Planning and Highways Committee
- Postcode
- BB3 2SN
Timeline
Dates from the published record
-
6 Jan 2026
Received by Blackburn with Darwen
-
20 Jan 2026
Validated
Checked as complete and ready for consideration.
-
29 May 2026
Decision issued: Permits
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
27 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Newlands 61 Manor Road Darwen BB3 2SN
Discharge Condition No.4 "boundary treatment" pursuant to planning application 10/24/0069
Granted Conditions 6 docs -
Newlands 61 Manor Road Darwen BB3 2SN
To form New Proposed Dwelling to Land at 61 Manor Road
Refused Full applications 14 docsDomestic -
Avalon 69 Manor Road Darwen BB3 2SN
Discharge Condition no.3 "details of proposed screening" pursuant to planning application 10/22/1138
Granted Conditions 7 docs -
77-79 Highthorpe Manor Rd Darwen BB3 2SN
Proposed first floor extension over existing side granny flat extension
Refused Full applications Extension 13 docs -
Highthorpe 77 Manor Rd Darwen BB3 2SN
Ground and first floor extensions
Granted Full applications Extension 16 docs -
9 Limes Avenue Darwen BB3 2SG
Proposed demolition of existing garage and construction of new oak framed garage with balcony above
Refused Full applications Demolition 6 docs
Other full applications applications
In Blackburn with Darwen
-
10/26/0360 Granted
Spout House Farm Bog Height Road Darwen BB3 0LF
Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations
-
10/26/0349 Granted
31 King William Street Blackburn BB1 7DJ
Installation of defibrillator and bleed kit cabinets to external wall
-
10/26/0332 Granted
30 Cleveleys Road Blackburn BB2 3JS
Proposed single storey side extension, detached garage and larger front porch
-
10/26/0529 Awaiting decision
Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX
Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling
-
10/26/0381 Granted
20 Mollington Road Blackburn BB2 6EG
Proposed single storey side/rear extension and front porch