Skip to content
PlanIndex Get alerts
Menu

Planning application

9-15 Town Hall Street Blackburn BB2 1AG

Granted Blackburn with Darwen 10/23/0130 Full Planning Application (Regulation 3)

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

New shop fronts

As published by the council, reference 10/23/0130

Application record

Reference
10/23/0130
Type
Full Planning Application (Regulation 3)
Status
FINAL DECISION
Decision
Permits
Received
14 Feb 2023
Validated
22 Feb 2023
Decided
21 Apr 2023
Ward
Blackburn Central
Parish
Blackburn
Decision by
Planning and Highways Committee
Postcode
BB2 1AG

Timeline

Dates from the published record

  1. 14 Feb 2023

    Received by Blackburn with Darwen

  2. 22 Feb 2023

    Validated

    Checked as complete and ready for consideration.

  3. 21 Apr 2023

    Decision issued: Permits

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 65 King William Street Blackburn BB1 7DT

    10/16/0310 Submitted 31 Mar 2016 25m away

    Change of use from A1Retail to A4 micro pub/drinking establishment

    Granted Full applications 29 docs
  • 9-15 Town Hall Street Blackburn BB2 1AG

    10/23/0131 Submitted 14 Feb 2023 39m away

    Fascia and hanging signs

    Granted Advertising 10 docs
  • 68 King William Street Blackburn BB1 7DT

    10/23/0393 Submitted 9 May 2023 52m away

    Installation of solar panels

    Withdrawn Full applications
  • 66 King William Street Blackburn BB1 7DT

    10/26/0288 Submitted 23 Mar 2026 52m away

    Change of use of ground floor from cafe (Use Class E(b)) to restaurant/takeaway (Sui Generis) and alterations to shop front including new windows, door and security shutters (retrospective)

    Granted Full applications Windows or glazing 7 docs
  • 66 King William Street Blackburn BB1 7DT

    10/26/0289 Submitted 23 Mar 2026 53m away

    97% historically approved · decision due ~20 May

    1no illuminated fascia sign and 1no illuminated projecting sign to shop front

    Awaiting decision Advertising Windows or glazing 3 docs
  • 1-3 Exchange Street Blackburn BB1 7JN

    10/23/0097 Submitted 6 Feb 2023 58m away

    Installation of illuminated and non illuminated fascia and hanging signs

    Granted Advertising 13 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications