Skip to content
PlanIndex Get alerts
Menu

Planning application

10/23/0010

Brook House 349 Chapeltown Road Turton Bolton BL7 0EQ

Granted Blackburn with Darwen Full Planning Application (Retrospective)

Proposal

Retention of annexe

As published by the council, reference 10/23/0010

Timeline

Dates from the published record

  1. 6 Jan 2023

    Received by Blackburn with Darwen

  2. 31 Jan 2023

    Validated

    Checked as complete and ready for consideration.

  3. 22 Mar 2023

    Decision issued: Permits

  4. 21 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 10/26/0396 Awaiting decision

    348 Chapeltown Road Turton Bolton BL7 0EJ

    Single extension to the front

    23 Apr 2026 85m away Full applications
  • 10/16/0783 Granted

    Billy Brook Meadow Off Station Road Chapeltown Bolton Turton BL7 0EL

    Erection of animal shelter in association with Natural England Higher Level Stewardship agreement

    19 Jul 2016 89m away Full applications
  • 10/24/0961 Granted

    Chapel House Farm High Street Chapeltown Bolton BL7 0EW

    Tree S1 (Sycamore) - Trim 2 branches at a height of 6m that are overhanging roof of Chapel House Farm. Tree S2 (Sycamore) - Trim branches that are overhanging Station Road to a height of 3m from the base. Trees S5, S6 & S7 (Sycamores) - Fell to prevent overcrowding.

    1 Nov 2024 162m away Trees
  • 10/26/0229 Awaiting decision

    54 Station Road Turton Bolton BL7 0HA

    Part single part double storey rear extension

    13 Mar 2026 268m away Full applications
  • 10/26/0369 Withdrawn

    87-89 High Street Chapeltown Bolton BL7 0EZ

    Replacement of 17 single glazed mullion front windows with narrow timber framed double glazed units

    17 Apr 2026 343m away Full applications
  • 10/16/0224 Granted

    11 Vale Street Edgworth Bolton BL7 0EB

    Single storey rear extension to accomodate a swimming pool.

    4 Mar 2016 401m away Full applications

In Blackburn with Darwen

  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0518 Awaiting decision

    207-209 Duckworth Street Darwen BB3 1AU

    Change of use of first floor to create new two bedroom flat (Use Class C3) and external alterations to side elevation

    3 Jun 2026 Full applications
  • 10/26/0520 Awaiting decision

    54 Lammack Road Blackburn BB1 8JX

    Demolition of existing garage and proposed double storey extension to side, front and rear and single storey rear extension

    3 Jun 2026 Full applications
  • 10/26/0516 Awaiting decision

    207 Burnley Road Blackburn BB1 3HW

    Conversion of garage to habitable room, rear single storey extension and front porch

    2 Jun 2026 Full applications
  • 10/26/0514 Awaiting decision

    54 York Crescent Blackburn BB1 9NW

    Proposed single storey side and rear extension

    2 Jun 2026 Full applications