Skip to content
PlanIndex Get alerts
Menu

Planning application

4 Mollington Road Blackburn BB2 6EG

Granted Blackburn with Darwen 10/21/0677 Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single Storey Rear Extension

As published by the council, reference 10/21/0677

Application record

Reference
10/21/0677
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
23 Jun 2021
Validated
5 Jul 2021
Decided
6 Aug 2021
Ward
Billinge & Beardwood
Parish
Blackburn
Decision by
Delegated
Postcode
BB2 6EG

Timeline

Dates from the published record

  1. 23 Jun 2021

    Received by Blackburn with Darwen

  2. 5 Jul 2021

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2021

    Decision issued: Permits

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 21 Edgeware Road Blackburn BB2 6DS

    10/21/0387 Submitted 13 Apr 2021 91m away

    Proposed single storey rear extension including alterations

    Granted Full applications Extension 9 docs
    Small domestic
  • 14 Edgeware Road Blackburn BB2 6DS

    10/18/0496 Submitted 21 May 2018 113m away

    Prune to create 0.5 metres clearance from the telephone line. Crown lift Sycamore tree on the back side to balance the tree. Sever ivy.

    Granted Trees 5 docs
  • 203 Revidge Road Blackburn BB2 6DT

    10/18/1130 Submitted 23 Nov 2018 116m away

    Proposed demolition of part timber framed utility room and construction of a replacement extension to create larger kitchen and terrace

    Granted Full applications Extension Demolition 13 docs
  • 8 Albany Road Blackburn BB2 6EQ

    10/25/0098 Submitted 5 Feb 2025 120m away

    Proposed rear dormer

    Withdrawn Full applications Loft or dormer 8 docs
  • 20 Mollington Road Blackburn BB2 6EG

    10/26/0381 Submitted 21 Apr 2026 120m away

    Proposed single storey side/rear extension and front porch

    Granted Full applications Extension 9 docs
    Small domestic
  • Land to the rear of 190 Revidge Road Blackburn BB2 6DT

    10/23/0064 Submitted 25 Jan 2023 136m away

    Change of use of land to residential garden (use class C3) and erection of boundary walls

    Refused Full applications 9 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications