Planning application
St Barnabus Church Of England School Knowlesly Road Darwen BB3 2JA
Works: Extension
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
Installation of a 24m x 12m MUGA pitch on existing school playing fields. 14mm Green Non-Infill artificial grass surface laird directly on to a prepared stone sub-base (with timber edging). with yellow and white sports markings. 2m high perimeter mesh fencing (dark green). 2 x single access gates, 2 x single goal ends, 2 x 3.24m high basketball posts at either end. MUGA is for use by the school, after school club, and will be available for community groups using the building eg cubs/ scouts. There is no intention to commercially rent out this facility out of hours.
As published by the council, reference 10/21/0655
Application record
- Reference
- 10/21/0655
- Type
- Full Planning Application
- Status
- WITHDRAWN
- Decision
- X Withdrawn Decision
- Received
- 21 Jun 2021
- Ward
- Principal Planning Officer
- Decision by
- Withdrawn-Council
- Postcode
- BB3 2JA
Timeline
Dates from the published record
-
21 Jun 2021
Received by Blackburn with Darwen
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The process from here
The applicant withdrew this application before the council decided it, so it carries no planning weight and no fee refund is automatic. Withdrawal often follows officer feedback that a refusal was likely.
The applicant is free to submit a revised application at any time, and many withdrawn schemes return in amended form, so the site is worth watching if the proposal affected you.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
36 Lapwing Lane Darwen BB3 2FQ
Conversion of garage to habitable room
Granted Full applications 5 docs -
11 Waterfield Avenue Darwen BB3 2EE
Erection of double storey side extension
Granted Full applications Extension 12 docs -
-
16 Jacks Key Drive Darwen BB3 2LG
Rear extension & roof works.
Granted Full applications Extension 18 docs -
Kirkhams Farm Cranberry Lane Darwen BB3 2HL
Change of use of barn to dwelling house, erection of single storey rear extension with balcony over and new open sided porch to side elevation
Granted Full applications Extension 9 docsSmall domestic -
14 Jacks Key Drive Darwen BB3 2LG
Single storey extension to rear and amendment to existing conservatory
Granted Full applications Extension 18 docsSmall domestic
Other full applications applications
In Blackburn with Darwen
-
10/26/0360 Granted
Spout House Farm Bog Height Road Darwen BB3 0LF
Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations
-
10/26/0349 Granted
31 King William Street Blackburn BB1 7DJ
Installation of defibrillator and bleed kit cabinets to external wall
-
10/26/0332 Granted
30 Cleveleys Road Blackburn BB2 3JS
Proposed single storey side extension, detached garage and larger front porch
-
10/26/0529 Awaiting decision
Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX
Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling
-
10/26/0381 Granted
20 Mollington Road Blackburn BB2 6EG
Proposed single storey side/rear extension and front porch