Planning application
30 Brantfell Road Blackburn BB1 8DN
Works: Windows or glazing
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Alterations to the window on side elevation and creating an opening in existing gable end to form outdoor covered area
As published by the council, reference 10/21/0379
Application record
- Reference
- 10/21/0379
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Permits
- Received
- 12 Apr 2021
- Validated
- 23 Apr 2021
- Decided
- 7 Jun 2021
- Ward
- Shear Brow & Corporation Park
- Parish
- Blackburn
- Decision by
- Delegated
- Postcode
- BB1 8DN
Timeline
Dates from the published record
-
12 Apr 2021
Received by Blackburn with Darwen
-
23 Apr 2021
Validated
Checked as complete and ready for consideration.
-
7 Jun 2021
Decision issued: Permits
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
6 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Land to rear of 1-19 Colenso Road Blackburn BB1 8DR
Proposed residential development for the erection of up to four dwellings
Granted Outline New dwelling 14 docsSeveral homes -
Land at Colenso Road Blackburn BB1 8DR
Removal of garages and residential development with up to 4 new dwellings
Granted Outline New dwelling 8 docsSeveral homes -
10 Brantfell Road Blackburn BB1 8DN
Rear dormer (retrospective) (amendments to previously refused application 10/21/1266 )
Refused Full applications Loft or dormer 8 docs -
118 Langham Road Blackburn BB1 8DP
Proposed single storey extension to rear to form a disable adaptation
Granted Full applications Extension 7 docsSmall domestic -
1 East Park Road Blackburn BB1 8DW
Proposed lower ground and ground floor rear extension to create additional accommodation
Granted Full applications Extension 11 docs
Other full applications applications
In Blackburn with Darwen
-
10/26/0360 Granted
Spout House Farm Bog Height Road Darwen BB3 0LF
Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations
-
10/26/0349 Granted
31 King William Street Blackburn BB1 7DJ
Installation of defibrillator and bleed kit cabinets to external wall
-
10/26/0332 Granted
30 Cleveleys Road Blackburn BB2 3JS
Proposed single storey side extension, detached garage and larger front porch
-
10/26/0529 Awaiting decision
Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX
Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling
-
10/26/0381 Granted
20 Mollington Road Blackburn BB2 6EG
Proposed single storey side/rear extension and front porch