Skip to content
PlanIndex Get alerts
Menu

Planning application

Westbourne Meins Road BLACKBURN BB2 6QF

Granted Blackburn with Darwen 10/17/1500 Full Planning Application

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of first floor extension over kitchen (undertaken as part of extant consent 10/15/0193 dated 23/07/2015)

As published by the council, reference 10/17/1500

Application record

Reference
10/17/1500
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
14 Dec 2017
Validated
15 Jan 2018
Decided
14 Feb 2018
Ward
Beardwood With Lammack
Parish
Blackburn
Decision by
Delegated
Postcode
BB2 6QF

Timeline

Dates from the published record

  1. 14 Dec 2017

    Received by Blackburn with Darwen

  2. 15 Jan 2018

    Validated

    Checked as complete and ready for consideration.

  3. 14 Feb 2018

    Decision issued: Permits

  4. 27 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

Documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Barcroft Carr Lane Blackburn BB2 6QG

    10/24/0914 Submitted 16 Oct 2024 50m away

    Extension to North and East elevations including internal and external remodelling work

    Withdrawn Full applications Extension
  • 17 Heathfield Park Blackburn BB2 6QJ

    10/23/0002 Submitted 3 Jan 2023 55m away

    Double storey side extension and balcony

    Granted Full applications Extension 8 docs
  • The Sanctuary Meins Road Blackburn BB2 6QQ

    10/21/0685 Submitted 24 Jun 2021 64m away

    Proposed 3 Bay detached garage and first floor office

    Withdrawn Full applications 12 docs
  • 1 Heathfield Park Blackburn BB2 6QJ

    10/22/1071 Submitted 14 Nov 2022 70m away

    Single storey side extension

    Granted Full applications Extension 10 docs
    Small domestic
  • Newlyns Meins Road Blackburn BB2 6QF

    10/23/0094 Submitted 6 Feb 2023 104m away

    Demolition of extension to an existing house, construction of 2 No. detached dwellings together with rearrangement of an existing access gate and creation of a new access gate

    Granted Full applications Extension Demolition 28 docs
  • 6 Heathfield Park Blackburn BB2 6QJ

    10/26/0475 Submitted 20 May 2026 145m away

    96% historically approved · decision due ~30 Jul

    Proposed two storey rear extension with balcony (part retrospective)

    Awaiting decision Full applications Extension 3 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications