Skip to content
PlanIndex Get alerts
Menu

Planning application

Lowood 1, The Warren Blackburn Blackburn With Darwen BB2 7BF

Refused Blackburn with Darwen 10/15/0086 Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of single storey and two storey front, side and rear extensions

As published by the council, reference 10/15/0086

Application record

Reference
10/15/0086
Type
Full Planning Application
Status
FINAL DECISION
Decision
Refuses
Received
23 Jan 2015
Validated
13 Feb 2015
Decided
30 Mar 2015
Ward
Beardwood With Lammack
Parish
Blackburn
Decision by
Delegated
Postcode
BB2 7BF

Timeline

Dates from the published record

  1. 23 Jan 2015

    Received by Blackburn with Darwen

  2. 13 Feb 2015

    Validated

    Checked as complete and ready for consideration.

  3. 30 Mar 2015

    Decision issued: Refuses

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Brackloon 2 The Warren Blackburn BB2 7BF

    10/21/0579 Submitted 2 Jun 2021 25m away

    Change in roof design from hip roof to pitched roof, including part rear double storey at the east elevation to application 10/19/0859, first floor front/side extension and external alterations to windows

    Granted Full applications Extension Windows or glazing 8 docs
  • 1 The Brambles Blackburn BB2 7QX

    10/19/1031 Submitted 29 Oct 2019 44m away

    Erection of detached outbuilding (Retrospective)

    Granted Full applications 5 docs
  • Yardene House Beardwood Fold Blackburn BB2 7AS

    10/23/0361 Submitted 26 Apr 2023 99m away

    T1 Sycamore - Remove 2 branches on the right stem which protrude over the garage and remove 1 branch on the left stem which protrudes over garage to give clearance from roof. T2 Sycamore - Remove stub to rear of the tree and remove epicormic growth and deadwood. T3 Sycamore - Remove epicormic growth, stubs and deadwood. T4 Sycamore - Remove stubs over neighbouring property and remove epicormic growth and deadwood.

    Granted Trees 4 docs
  • 19 The Dene Blackburn BB2 7QS

    10/26/0106 Submitted 6 Feb 2026 103m away

    Proposed two-storey side and rear extension with an associated single-storey rear extension

    Granted Full applications Extension 8 docs
    Small domestic
  • 5, The Spinney Blackburn BB2 7BN

    10/21/0644 Submitted 17 Jun 2021 107m away

    Erection of first floor bedroom extension to side

    Granted Full applications Extension 7 docs
  • 3 The Coppice Blackburn BB2 7BQ

    10/21/0536 Submitted 21 May 2021 108m away

    First-floor extension

    Granted Full applications Extension 3 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications