Skip to content
PlanIndex Get alerts
Menu

Planning application

238 Audley Range Blackburn

Granted Blackburn with Darwen 10/14/0962 Full Planning Application

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Single storey rear extension

As published by the council, reference 10/14/0962

Application record

Reference
10/14/0962
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
18 Sep 2014
Validated
1 Oct 2014
Decided
19 Dec 2014
Ward
Audley
Parish
Blackburn
Decision by
Delegated

Timeline

Dates from the published record

  1. 18 Sep 2014

    Received by Blackburn with Darwen

  2. 1 Oct 2014

    Validated

    Checked as complete and ready for consideration.

  3. 19 Dec 2014

    Decision issued: Permits

  4. 17 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 177 Walter Street Blackburn BB1 1TJ

    10/21/1006 Submitted 1 Sep 2021 82m away

    Erection of single storey rear extension 3.6m from rear wall, max height: 3.2m, height to eaves: 2.5m

    Withdrawn Householder Extension 4 docs
    Small domestic
  • 177 Walter Street Blackburn BB1 1TJ

    10/21/0869 Submitted 30 Jul 2021 82m away

    Erection of single storey extension to rear from Original rear wall. 3.6m from rear wall max height 3.2m, height to eaves 2.5m

    Withdrawn Householder Extension 4 docs
    Small domestic
  • 12 St Thomas Street Blackburn BB1 1PB

    10/26/0382 Submitted 21 Apr 2026 88m away

    Erection of single storey rear extension 6.000m from original rear wall, Max Height: 2.700m, Height to Eaves: 2.450m

    Granted Householder Extension 5 docs
    Small domestic
  • Patel Newsagents 194 Audley Range Blackburn BB1 1TG

    10/14/0153 Submitted 26 Feb 2014 103m away

    Two storey rear extension, new shop front with roller shutter, enlargement of ground floor window on side elevation and relocation of first floor window on side elevation

    Refused Full applications Extension Windows or glazing 22 docs
  • Patel Newsagents 194 Audley Range Blackburn BB1 1TG

    10/14/1188 Submitted 14 Nov 2014 103m away

    Proposed two storey rear extension, new shop front and roller shutters (resubmission of 10/14/0153)

    Granted Full applications Extension Windows or glazing 38 docs
  • 9 Nottingham Close Blackburn BB1 1AG

    10/25/0260 Submitted 11 Mar 2025 127m away

    Erection of single storey extension to rear and installation of windows to existing side gable elevations

    Withdrawn Full applications Extension Windows or glazing 3 docs
    Small domestic

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications