Planning application
3 Moorlands Court Darwen BB3 3LQ
Works: Extension Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Two storey side and rear extension including demolition of existing double garage and amendments to driveway access
As published by the council, reference 10/13/0802
Application record
- Reference
- 10/13/0802
- Type
- Full Planning Application
- Status
- FINAL DECISION
- Decision
- Permits
- Received
- 6 Sep 2013
- Validated
- 1 Oct 2013
- Decided
- 31 Oct 2013
- Ward
- Marsh House
- Parish
- Darwen
- Decision by
- Delegated
- Postcode
- BB3 3LQ
Timeline
Dates from the published record
-
6 Sep 2013
Received by Blackburn with Darwen
-
1 Oct 2013
Validated
Checked as complete and ready for consideration.
-
31 Oct 2013
Decision issued: Permits
-
3 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
Land at Pole Lane Darwen
97% historically approved · decision due ~22 Aug
Non-material amendment pursuant to Reserved matters application 10/16/0789 "for erection of 126 dwellings pursuant to outline planning approval 10/12/0933. at Land at Pole Lane, Darwen" - hand the layouts to Plots 15 and 16; change of external brick material to Forterra Teviot Red for Plots 98 and 99
Awaiting decision Amendments 5 docsMajor scheme -
25 Spring Meadows DARWEN BB3 3JS
Demolition of existing conservatory and erection of single storey side and rear extension with flat roof
Granted Full applications Extension DemolitionSmall domestic -
25 Spring Meadows Darwen BB3 3JS
Non material amendment pursuant to planning application 10/20/1111 to amend roof design of single storey rear extension
Granted Amendments Extension 8 docsSmall domestic -
23 Northumberland Close Darwen BB3 2TN
Rear single storey extension
Granted Full applications Extension 6 docsSmall domestic -
48 Lavender Avenue Darwen BB3 3GW
Conversion of detached garage into habitable room and external alterations
Withdrawn Lawful development
Other full applications applications
In Blackburn with Darwen
-
10/26/0360 Granted
Spout House Farm Bog Height Road Darwen BB3 0LF
Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations
-
10/26/0349 Granted
31 King William Street Blackburn BB1 7DJ
Installation of defibrillator and bleed kit cabinets to external wall
-
10/26/0332 Granted
30 Cleveleys Road Blackburn BB2 3JS
Proposed single storey side extension, detached garage and larger front porch
-
10/26/0529 Awaiting decision
Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX
Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling
-
10/26/0381 Granted
20 Mollington Road Blackburn BB2 6EG
Proposed single storey side/rear extension and front porch