Skip to content
PlanIndex Get alerts
Menu

Planning application

Former market site, Blackburn Lancashire

Granted Blackburn with Darwen 10/13/0760 Full Planning Application

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Hardstanding area and temporary portakabin accommodation to be provided within the Blackburn Temporary Bus Station.

As published by the council, reference 10/13/0760

Application record

Reference
10/13/0760
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
20 Aug 2013
Validated
23 Sep 2013
Decided
26 Nov 2013
Ward
Shear Brow
Parish
Blackburn
Decision by
Planning and Highways Committee

Timeline

Dates from the published record

  1. 20 Aug 2013

    Received by Blackburn with Darwen

  2. 23 Sep 2013

    Validated

    Checked as complete and ready for consideration.

  3. 26 Nov 2013

    Decision issued: Permits

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

12 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Former Market Site, Land Bounded by Brown Street, Ainsworth Street and Penny Street, Blackburn

    10/24/0595 Submitted 26 Jun 2024 53m away

    Hybrid Application; Full application for Building One (Use Class F1 for the provision of education, with ancillary Use Classes E(b)(café) and E(g) offices) and accompanying service areas, changes to the road layout, reconfiguration of taxi pick-up/drop off, flood attenuation basins, surrounding public realm and landscaping, and relocation of existing café unit; and Outline application, including access, landscaping and layout, with appearance and scale matters reserved, for Building Two (Use Classes F1/E(g) - education and/or offices/research and development with ancillary Use Classes, E(a) retail, E(b)(café)) and new free-standing café unit.

    Granted Outline 71 docs
  • Chaii Paani Brown Street Car Park Blackburn

    10/25/0475 Submitted 30 Apr 2025 57m away

    Retention of Existing Prefabricated Shipping Container to Current Cafe (Class Eb) following Planning Approval No: 10/21/0037

    Withdrawn Amendments
  • Land Junction of Ainsworth Street & Brown Street Blackburn

    10/21/0586 Submitted 1 Jun 2021 57m away

    Discharge Condition No.4 "CCTV and Drainage reports" pursuant to planning application 10/21/0037

    Decided Conditions 8 docs
  • St John's Centre Victoria Street Blackburn

    10/26/0321 Submitted 30 Mar 2026 112m away

    Variation of Condition 2 (Approved Plans), pursuant to listed building consent 10/23/0778 "Conversion and extension of existing Grade II listed church to provide office accommodation" - amendments to roof profile including installation of roof lantern and general internal alterations

    Granted Amendments Extension Windows or glazing 32 docs
  • Ainsworth Mall Ainsworth Street Blackburn BB1 6AW

    10/16/0893 Submitted 19 Aug 2016 114m away

    Change of use of Unit 6, The Mall Shopping Centre from A1 (Retail) to A3 (Food & Drink) including new shop front.

    Granted Full applications Windows or glazing 22 docs
  • 55 James Street BLACKBURN BB1 6BE

    10/16/1362 Submitted 14 Dec 2016 129m away

    New door openings and steel staircase to rear

    Granted Full applications 25 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications