Skip to content
PlanIndex Get alerts
Menu

Planning application

Hampden Mill Grimshaw Street Darwen BB3 2QJ

Granted Blackburn with Darwen 10/13/0568 Full Planning Application

Works: Roofing Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of 2 stories of mill and new roof to ground floor

As published by the council, reference 10/13/0568

Application record

Reference
10/13/0568
Type
Full Planning Application
Status
FINAL DECISION
Decision
Permits
Received
20 Jun 2013
Validated
19 Jul 2013
Decided
6 Sep 2013
Ward
Whitehall
Parish
Darwen
Decision by
Delegated
Postcode
BB3 2QJ

Timeline

Dates from the published record

  1. 20 Jun 2013

    Received by Blackburn with Darwen

  2. 19 Jul 2013

    Validated

    Checked as complete and ready for consideration.

  3. 6 Sep 2013

    Decision issued: Permits

  4. 3 Sep 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Units 1 And 2 Spring Vale House Spring Vale Road Darwen BB3 2ES

    10/17/1301 Submitted 24 Oct 2017 145m away

    Discharge of Condition No.3 pursuant to planning application 10/16/0849

    Granted Conditions
  • 2 Old Stable Cottage Hampden Fold Hampden Avenue Darwen BB3 2HB

    10/25/0933 Submitted 12 Sep 2025 156m away

    Single storey rear extension and external alterations to windows

    Withdrawn Lawful development Extension Windows or glazing 2 docs
    Small domestic
  • 378-380 Bolton Road Darwen BB3 2PS

    10/25/1172 Submitted 10 Nov 2025 181m away

    97% historically approved · decision due ~27 Jan

    Change of use of ground floor from commercial unit to dwelling (Use Class C3)

    Awaiting decision Prior approval 9 docs
    Domestic
  • Land Facing Thompson Street Lancashire Darwen BB3 2EZ

    10/17/0907 Submitted 25 Jul 2017 189m away

    Erection of two pairs of semi-detached houses, two of which have single storey attached garages, together with an altered car park to serve the former borough hotel.

    Granted Full applications
    Small domestic
  • Land facing Thompson Street Darwen BB3 2EY

    10/21/0588 Submitted 4 Jun 2021 201m away

    Erection of two pairs of semi-detached houses, two of which have single storey attached garages, together with an altered car park to serve the former borough hotel

    Granted Full applications 11 docs
    Small domestic
  • 34 Hampden Avenue Darwen Lancashire BB3 2HB

    10/24/0723 Submitted 1 Aug 2024 211m away

    Demolition of existing detached garage and erection of double storey side extension

    Granted Full applications Extension Demolition 10 docs

In Blackburn with Darwen

  • 10/26/0360 Granted

    Spout House Farm Bog Height Road Darwen BB3 0LF

    Proposed single storey flat roof rear extension with balcony, loft conversion, dormer extension and internal alterations

    15 Apr 2026 Full applications
  • 10/26/0349 Granted

    31 King William Street Blackburn BB1 7DJ

    Installation of defibrillator and bleed kit cabinets to external wall

    14 Apr 2026 Full applications
  • 10/26/0332 Granted

    30 Cleveleys Road Blackburn BB2 3JS

    Proposed single storey side extension, detached garage and larger front porch

    7 Apr 2026 Full applications
  • 10/26/0529 Awaiting decision

    Longshaw Head Barn Crowthorn Road Edgworth Bolton BL7 0JX

    Proposed two storey side / rear extension with front, rear dormers and external alterations to dwelling

    8 Jun 2026 Full applications
  • 10/26/0381 Granted

    20 Mollington Road Blackburn BB2 6EG

    Proposed single storey side/rear extension and front porch

    21 Apr 2026 Full applications