Planning application
Land north of Leicester Road Sapcote
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Application for discharge of condition 13 (Construction Traffic Management Plan) imposed on planning permission 24/0511/OUT.
As published by the council, reference 26/0688/DOC
Application record
- Reference
- 26/0688/DOC
- Type
- Discharge of Conditions
- Status
- Awaiting decision
- Received
- 14 Aug 2026
- Validated
- 14 Aug 2026
- Decision by
- Delegated
Site history
Applications at this address on the Blaby register
This site has had 6 applications since 2026.
-
26/0834/DOC Awaiting decision
Land north of Leicester Road Sapcote
Application for discharge of condition 8 (Habitat Management Monitoring Plan) imposed on planning permission 24/0511/OUT.
-
26/0687/DOC Awaiting decision
Land north of Leicester Road, Sapcote
Application for discharge of condition 7 (Biodiversity CEMP) imposed on planning permission 24/0511/OUT.
-
26/0677/DOC Awaiting decision
Land North of Leicester Road, Sapcote
Application for discharge of conditions 18 (Site Levels and Finished Floor Levels), 26 (Surface Water Drainage Scheme) and 27 (Surface Water Drainage Scheme During Construction) imposed on planning permission 24/0511/OUT.
-
26/0631/DOC Decided
Land north of Leicester Road, Sapcote
Application for discharge of condition 29 (Infiltration Testing) imposed on planning permission 24/0511/OUT
-
26/0620/DOC Decided
Land north of Leicester Road, Sapcote
Application for discharge of conditions 10 (Phase 2 Site Investigation) and 20 (Arboricultural Impact Assessment and Method Statement) imposed on planning permission 24/0511/OUT
Timeline
Dates from the published record
-
14 Aug 2026
Received by Blaby
-
25 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 9 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Blaby took a median of 76 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
- Application Form - Without Personal Data
- CEMP including Construction Traffic Management Plan
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Blaby for determination, against a statutory target of eight weeks. Over the last year Blaby decided condition discharge and variation applications in a median of 91 days. More in our guide to how long planning decisions take.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Other condition discharge and variation applications
In Blaby
-
26/0924/DOC Awaiting decision
Petrol Station Station Road Glenfield Leicester Leicestershire LE3 8BQ
To discharge conditions 3 (facing materials), 5 (landscaping), 9 (drainage), 10 (cycle parking), 15 (CCTV and external lighting) and 16 (Biodiversity Enhancement) attached to 25/0764/FUL.
-
26/0909/DOC Awaiting decision
21A Treasure Close Glenfield Leicester Leicestershire LE3 8LT
Discharge of Condition 4 (noise impact assesment) of 26/0457/HH
-
26/0894/DOC Awaiting decision
2 Duncan Avenue Huncote Leicester Leicestershire LE9 3AP
Discharge of Condition 16 (construction management plan) of 23/0583/FUL
-
26/0893/DOC Awaiting decision
2 Duncan Avenue Huncote Leicester Leicestershire LE9 3AP
Discharge of Conditions; 3 (Materials schedule) and 7 (Surface water drainage) of 23/0583/FUL
-
26/0545/DOC Granted
21 Stelle Way Glenfield Leicester Leicestershire LE3 8HN
Discharge of condition 5 (Arboricultural Method Statement) of 24/0137/HH