Planning application

Former Hilton Hotel Junction 21 Approach Braunstone Town Leicester Leicestershire LE19 1WQ

Granted Blaby 26/0248/FUL Full Application

Works: Extension Demolition Windows or glazing Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing porte cochere and construction of new goal post framed entrance, single storey glazed link corridor and single storey HYROX studio space extension with associated plant and machinery, access and landscaping.

As published by the council, reference 26/0248/FUL

Application record

Reference
26/0248/FUL
Type
Full Application
Status
Decided
Decision
Application Permitted
Received
23 Mar 2026
Validated
24 Apr 2026
Decided
12 Aug 2026
Ward
Braunstone Millfield
Parish
Braunstone Town Council
Decision by
Delegated
Postcode
LE19 1WQ

Timeline

Dates from the published record

  1. 23 Mar 2026

    Received by Blaby

  2. 24 Apr 2026

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2026

    Added to PlanIndex

  4. 12 Aug 2026

    Decision issued: Application Permitted

Documents

Plans, drawings, consultee responses and the officer's report

56 documents on file for this application

  • DECISION NOTICE Decision · 12 Aug 2026
  • ECOLOG - Ecology Consultation Response · 10 Aug 2026
  • Bat Emergence Surgery Report · 29 Jul 2026
  • National Highways 22.07.2026 Consultation Response · 22 Jul 2026
  • Applicants response to LCC Ecology Statement · 20 Jul 2026
  • Environmental Services 15.07.2026 Consultation Response · 15 Jul 2026
  • Environmental Services 15.07.2026 Consultation Response · 15 Jul 2026
  • LCC Ecology 10.07.2026 Consultation Response · 10 Jul 2026
  • Agents response to bat licences Statement · 07 Jul 2026
  • BNG Metric Statement · 03 Jul 2026
  • LCC Ecology 26.06.2026 Consultation Response · 26 Jun 2026
  • Bat Emergence Survey Report Report · 22 Jun 2026
  • Preliminary Ecological Appraisal Report · 22 Jun 2026
  • Condition Assessment Sheets Statement · 22 Jun 2026
  • BNG Metric Statement · 22 Jun 2026
  • Braunstone Town Council 19.05.2026 Consultation Response · 19 May 2026
  • LCC Highways 18.05.2026 Consultation Response · 18 May 2026
  • LLFA 15.05.2026 Consultation Response · 15 May 2026
  • LCC Ecology 12.05.2026 Consultation Response · 12 May 2026
  • County Minerals & Waste 28.04.2026 Consultation Response · 28 Apr 2026
  • Environment Agency 28.04.2026 Consultation Response · 28 Apr 2026
  • Location Plan Drawing · 27 Apr 2026
  • Application Form - Without Personal Data Other · 24 Apr 2026
  • BNG Metric Statement · 13 Apr 2026
  • Preliminary Ecological Appraisal Statement · 13 Apr 2026
  • Existing ground floor plan Drawing · 13 Apr 2026
  • Proposed ground floor plan Drawing · 13 Apr 2026
  • Application Form - Without Personal Data Superseded Document/Report · 23 Mar 2026
  • Proposed main entrance signage post Drawing · 23 Mar 2026
  • Proposed elevations Drawing · 23 Mar 2026
  • Proposed link elevations Drawing · 23 Mar 2026
  • Existing elevations Drawing · 23 Mar 2026
  • Existing elevations 2 Drawing · 23 Mar 2026
  • Existing ground floor plan Drawing · 23 Mar 2026
  • Proposed ground floor plan Superseded Drawing · 23 Mar 2026
  • Existing first floor plan Drawing · 23 Mar 2026
  • Proposed first floor plan Drawing · 23 Mar 2026
  • Existing roof plan Drawing · 23 Mar 2026
  • Proposed roof plan Drawing · 23 Mar 2026
  • Proposed sections Drawing · 23 Mar 2026
  • Existing sections Drawing · 23 Mar 2026
  • Existing site plan Drawing · 23 Mar 2026
  • Proposed site plan Drawing · 23 Mar 2026
  • Existing 3D view northeast and southwest Drawing · 23 Mar 2026
  • Proposed 3D view from northeast and southwest Drawing · 23 Mar 2026
  • Proposed gym extension Drawing · 23 Mar 2026
  • Proposed link corridor floor plan Drawing · 23 Mar 2026
  • Location plan Superseded Drawing · 23 Mar 2026
  • Flood Risk Assessment & Drainage Strategy Report · 23 Mar 2026
  • Design & Access Statement - Part 1 Report · 23 Mar 2026
  • Design & Access Statement - Part 2 Report · 23 Mar 2026
  • Design & Access Statement - Part 3 Report · 23 Mar 2026
  • Noise Impact Assessment Report · 23 Mar 2026
  • Planning Statement Statement · 23 Mar 2026
  • Town Centre Use Sequential Test Report · 23 Mar 2026
  • Transport Statement Report · 23 Mar 2026

Trade members open them from here.

Open the documents

What this grant of permission means

Blaby granted permission on 12 August 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

In Blaby

  • 26/0722/FUL Awaiting decision

    Asda Stores Ltd Narborough Road South Enderby Leicester Leicestershire LE3 2LL

    Change of use of part of car park for the purchasing and storage of used vehicles and the erection of a single storey modular building for ancillary office use

    28 Aug 2026 Full applications
  • 26/0461/FUL Granted

    Unit B Optimus Way Glenfield Leicester Leicestershire LE3 8JR

    Installation of a 600kwh Combined Heat and Power unit (CHP)

    27 May 2026 Full applications
  • 26/0444/FUL Granted

    Western Annexe County Hall Leicester Road Glenfield Town Glenfield Leicester Leicestershire LE3 8RE

    Erection of a single storey north-east extension and external alterations.

    20 May 2026 Full applications
  • 26/0100/FUL Granted

    Land Off Tay Road & Dee Way Lubbesthorpe

    Retention of the temporary change of use of land to use class Sui Generis for the storage of up to 5x 50-seater buses and 1x sprinter vehicle along with the siting of an ancillary mobile building, for a period of up to 3 years.

    6 Feb 2026 Full applications
  • 26/0705/FUL Awaiting decision

    Silver Edge Gullet Lane Kirby Muxloe Leicester Leicestershire LE9 2BL

    Erection of a four bedroom dwelling (resubmission of 25/0978/FUL)

    21 Aug 2026 Full applications