Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To South West Of Cork Lane Glen Parva Leicestershire

Granted Blaby 23/0188/DOC Discharge of Conditions

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of conditions 3 (materials) 4, (foul and surface water drainage) and 5 (scheme for surface water drainage) attached to planning permission 15/0176/OUT

As published by the council, reference 23/0188/DOC

Application record

Reference
23/0188/DOC
Type
Discharge of Conditions
Status
Decided
Decision
Granted As published: Application Permitted
Received
6 Mar 2023
Validated
7 Mar 2023
Decided
22 May 2024
Ward
Glen Parva
Parish
Glen Parva Parish Council
Decision by
Delegated

Site history

Applications at this address on the Blaby register

This site has had 5 applications since 2023: 3 approved, 1 refused.

  • 26/0686/DOC Awaiting decision

    Land to South West of Cork Lane, Glen Parva, Leicestershire

    Discharge of conditions 9 (Construction Method Statement), 13 (piling method statement) and 22 (Construction Environment Management Plan for biodiversity) of 24/0133/FUL.

    Submitted 13 Aug 2026 Conditions
  • 24/0802/DOC Granted

    Land To South West Of Cork Lane Glen Parva Leicestershire

    Application for approval of details reserved by condition 18 (residential travel plan) attached to planning permission 15/0176/OUT

    Decided 25 Nov 2024 Conditions
  • 24/0241/DOC Refused

    Land To South West Of Cork Lane Glen Parva Leicestershire

    Application for approval of details reserved by condition 9 (biodiversity management plan) attached to appeal decision APP/T2405/W/22/3302956

    Decided 6 Jan 2025 Conditions
  • 23/0511/NMAT Granted

    Land To South West Of Cork Lane Glen Parva Leicestershire

    Substitution of previously approved drawing G128-BRP-00-00-DR-A-8002 for new drawing GPA003-BRP-00-ZZ-DR-A-SIT-0002-P17 Site Layout - As Proposed

    Decided 3 Nov 2023 Amendments

Timeline

Dates from the published record

  1. 6 Mar 2023

    Received by Blaby

  2. 7 Mar 2023

    Validated

    Checked as complete and ready for consideration.

  3. 22 May 2024

    Decision issued: Application Permitted

  4. 17 Aug 2026

    Added to PlanIndex

Cases linked to this one on the register

  • Application: 15/0176/OUT (Decided)

Documents

Plans, drawings, consultee responses and the officer's report

72 documents on file for this application

  • DECISION NOTICE Decision · 22 May 2024
  • Materials Schedule Report · 21 May 2024
  • Conditions 4 and 5 Decision · 10 May 2024
  • 17-14595 0-960C2 MASONRY RETAINING WALLS AND MASONRY WALL DETAILS[1] Drawing · 08 May 2024
  • GPA003-BRP-00-ZZ-DR-A-SIT-0033-P04 SITE LAYOUT - MATERIALS SCHEDULE Superseded Document/Report · 02 May 2024
  • Lead Local Flood Authority Consultation Response · 09 Apr 2024
  • 3404074-DRAWING-FACING MATERIALS MASTER PLAN GPA003-BRP-00-ZZ-DR-A-SIT-0026-P12 Drawing · 14 Mar 2024
  • 3404073-DRAWING-FACING MATERIALS PLAN F GPA003-BRP-00-ZZ-DR-A-SIT-0025-P13. Drawing · 14 Mar 2024
  • 3404072-DRAWING-FACING MATERIALS PLAN E GPA003-BRP-00-ZZ-DR-A-SIT-0024-P13 Drawing · 14 Mar 2024
  • 3404071-DRAWING-FACING MATERIALS PLAN D GPA003-BRP-00-ZZ-DR-A-SIT-0023-P13 Drawing · 14 Mar 2024
  • 3404070-DRAWING-FACING MATERIALS PLAN C GPA003-BRP-00-ZZ-DR-A-SIT-0022-P13 Drawing · 14 Mar 2024
  • 3404069-DRAWING-FACING MATERIALS PLAN B GPA003-BRP-00-ZZ-DR-A-SIT-0021-P13 Drawing · 14 Mar 2024
  • 3404068-DRAWING-FACING MATERIALS PLAN A GPA003-BRP-00-ZZ-DR-A-SIT-0020-P13 Drawing · 14 Mar 2024
  • LLFA Consultation Response · 05 Oct 2023
  • Pond Details 0-714 Rev T4 Amended Drawing · 14 Sep 2023
  • Large concrete circular cover slabs Other · 14 Sep 2023
  • Drainage System Strategy September 2023 Report · 14 Sep 2023
  • Surface Water Network Design Calculations Sept 23 Report · 14 Sep 2023
  • S104 Storm MH Schedules 0-712 Rev T5 Report · 14 Sep 2023
  • Drainage Details - Sheet 1 0-710 Rev T4 Drawing · 14 Sep 2023
  • S104 Eastment Plan 0-601 Rev T4 Drawing · 14 Sep 2023
  • Drainage Longitudinal Sections Outside Carriageways 0-600 Rev T2 Drawing · 14 Sep 2023
  • Impermeable Areas Plan 0-104 Rev T6 Drawing · 14 Sep 2023
  • S104 Drainage Layout 0-100 Rev T7 Drawing · 14 Sep 2023
  • LLFA Consultation Response · 27 Jul 2023
  • Environmental Services Consultation Response · 19 Jul 2023
  • Adoptable Pipe Schedule Technical Data · 03 Jul 2023
  • Applicant response to LLFA representation Other · 03 Jul 2023
  • Sewer Blockage Flood Routing 0-0107 Rev T1 Drawing · 03 Jul 2023
  • S104 Drainage Layout 0-100 Rev T6 Superseded Drawing · 03 Jul 2023
  • Impermeable Areas Plan 0-104 Rev T5 Superseded Document/Report · 03 Jul 2023
  • Independent Water Networks Ltd Technical Approval Certificate Other · 03 Jul 2023
  • Project Environmental Plan first draft Report · 03 Jul 2023
  • STW Sewer Record Drawing · 03 Jul 2023
  • Model Sewer Adoption Agreement Legal Agreement · 03 Jul 2023
  • Greenfield runoff rate estimation Technical Data · 03 Jul 2023
  • STW letter to applicant 21-09-2018 Letter · 03 Jul 2023
  • Drainage System Strategy April 2023 Superseded Document/Report · 03 Jul 2023
  • May 2023 Surface Water Network Design Calculations Technical Data · 03 Jul 2023
  • Pond Details 0-714 Rev T3 Superseded Drawing · 03 Jul 2023
  • S104 Storm MH Schedules 0-712 Rev T4 Superseded Document/Report · 03 Jul 2023
  • S104 Eastment Plan 0-601 Rev T3 Superseded Drawing · 03 Jul 2023
  • Drainage Longitudinal Sections Outside Carriageways 0-600 Rev T2 Superseded Document/Report · 03 Jul 2023
  • Road 1 Longitudinal Section and Setting Out Details 0-0301 Rev T3 Technical Data · 03 Jul 2023
  • Environmental Health 31.03.2023 Consultation Response · 31 Mar 2023
  • Lead Local Flood Authority 28.03.2023 Consultation Response · 28 Mar 2023
  • Environment Agency 10.03.2023 Consultation Response · 10 Mar 2023
  • Application Form - Without Personal Data Application Form · 07 Mar 2023
  • Adoptable Surface Water Pipe Schedule Superseded Document/Report · 06 Mar 2023
  • Drainage Longitudinal Sections Outside Carriageways 0-600 Rev T1 Superseded Document/Report · 06 Mar 2023
  • S104 Eastment Plan 0-601 Rev T2 Superseded Drawing · 06 Mar 2023
  • Drainage Details - Sheet 1 0-710 Rev T3 Superseded Drawing · 06 Mar 2023
  • Drainage details - Sheet 2 0-711 Rev T2 Drawing · 06 Mar 2023
  • S104 Storm MH Schedules 0-712 Rev T2 Superseded Document/Report · 06 Mar 2023
  • S104 Foul MH Schedules 0-713 Rev T2 Technical Data · 06 Mar 2023
  • Surface Water Network Design Calculations Superseded Document/Report · 06 Mar 2023
  • Foul Water Network Design Calculations Technical Data · 06 Mar 2023
  • S104 Drainage Layout 0-100 Rev T3 Superseded Drawing · 06 Mar 2023
  • Pond Details 0-714 Rev T1 Superseded Drawing · 06 Mar 2023
  • Drainage System Strategy Superseded Document/Report · 06 Mar 2023
  • External works overview area locations 0-200 Rev C4 Drawing · 06 Mar 2023
  • External works - area 1 0-201 Rev C4 Superseded Drawing · 06 Mar 2023
  • External works - area 2 0-202 Rev C4 Drawing · 06 Mar 2023
  • External works - area 3 0-203 Rev C4 Drawing · 06 Mar 2023
  • External works - area 4 0-204 Rev C4 Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan A GPA003-BRP-00-ZZ-DR-A-SIT-0020-P08 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan B GPA003-BRP-00-ZZ-DR-A-SIT-0021-P07 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan C GPA003-BRP-00-ZZ-DR-A-SIT-0022-P08 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan D GPA003-BRP-00-ZZ-DR-A-SIT-0023-P07 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan E GPA003-BRP-00-ZZ-DR-A-SIT-0024-P07 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Plan F GPA003-BRP-00-ZZ-DR-A-SIT-0025-P08 Superseded Drawing · 06 Mar 2023
  • Site Layout - Facing Materials Masterplan GPA003-BRP-00-ZZ-DR-A-SIT-0026-P06 Superseded Drawing · 06 Mar 2023

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Blaby granted permission on 22 May 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

In Blaby

  • 26/0924/DOC Awaiting decision

    Petrol Station Station Road Glenfield Leicester Leicestershire LE3 8BQ

    To discharge conditions 3 (facing materials), 5 (landscaping), 9 (drainage), 10 (cycle parking), 15 (CCTV and external lighting) and 16 (Biodiversity Enhancement) attached to 25/0764/FUL.

    Received 9 Oct, published by the council 13 Oct 2026 Conditions
  • 26/0909/DOC Awaiting decision

    21A Treasure Close Glenfield Leicester Leicestershire LE3 8LT

    Discharge of Condition 4 (noise impact assesment) of 26/0457/HH

    Received 7 Oct, published by the council 20 Oct 2026 Conditions
  • 26/0894/DOC Awaiting decision

    2 Duncan Avenue Huncote Leicester Leicestershire LE9 3AP

    Discharge of Condition 16 (construction management plan) of 23/0583/FUL

    Received 5 Oct, published by the council 13 Oct 2026 Conditions
  • 26/0893/DOC Awaiting decision

    2 Duncan Avenue Huncote Leicester Leicestershire LE9 3AP

    Discharge of Conditions; 3 (Materials schedule) and 7 (Surface water drainage) of 23/0583/FUL

    Received 5 Oct, published by the council 13 Oct 2026 Conditions
  • 26/0545/DOC Granted

    21 Stelle Way Glenfield Leicester Leicestershire LE3 8HN

    Discharge of condition 5 (Arboricultural Method Statement) of 24/0137/HH

    Received 22 Jun, published by the council 22 Jul 2026 Conditions