Planning application
2026/03160/PA
Hamstead Campus Mitton Road Birmingham B20 2JR
Proposal
Refurbishment works comprising new WC, shower, office, laundry and storage facilities, minor external works to include replacement signage, a new glazed external door and the installation of sun pipes
As published by the council, reference 2026/03160/PA
Timeline
Dates from the published record
-
12 Jun 2026
Received by Birmingham
-
23 Jul 2026
Validated
Checked as complete and ready for consideration.
-
29 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
2026/03782/PA Awaiting decision
Hamstead Campus, Friary Road, Birmingham, B20 1AP
Listed building consent for the proposed refurbishment works comprising new WC, shower, office, laundry and storage facilities, minor external works to include replacement signage, a new glazed external door and the installation of sun pipes
-
2025/04885/PA Granted
6 Woodcroft Avenue Birmingham B20 1AS
Erection of 4 metre deep single storey rear extension. Maximum height 4 metres, eaves height 2.7 metres
-
2025/06029/PA Granted
34 Grestone Avenue Birmingham B20 1AX
Erection of first floor side and rear extension
-
2026/02516/PA Awaiting decision
Albrighton House, Quorn House, Meynell House, Cottesmore House and Pytchley House Browns Green Handsworth Wood Birmingham B20
Reroofing of buildings and installation of air source heat pumps and associated works.
-
2025/05547/PA Granted
24 Winleigh Road Birmingham B20 2HN
Erection of first floor side and single storey rear extensions
-
2026/02605/PA Withdrawn
246 Rookery Road Handsworth Wood Birmingham B21 9QG
Erection of single storey rear extension
Other full applications applications
In Birmingham
-
2026/02114/PA Granted
footpath outside 30 New John Street Birmingham B19 3NB
Installation of 1no. BT street hub unit
-
2026/02177/PA Withdrawn
1 Braham Street London E1 8EE England
Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit
-
2026/01961/PA Granted
Bellfield Junior And Infant School, Vineyard Road, Birmingham, B31 1PT
Part demolition of existing building and erection of single storey side extension.
-
2026/02398/PA Refused
8 Baker Street Springfield Birmingham B11 4SF
Change of use of ground floor from retail (Use Class E) to 2no. self-contained apartments (Use Class C3)
-
2026/04370/PA Awaiting decision
Birmingham Dental Hospital And School Of Dentistry, 5 Mill Pool Way, Birmingham, B5 7EG
Erection of two single storey extensions to temporary Dental Hospital Operating Theatre and continued use until 31 October 2031.