Planning application

2025/06137/PA

St James House 1 St James Place Nechells Birmingham B7 4JE

Granted Birmingham Full Planning

Proposal

Demolition of existing building and erection of 10 storey purpose-built student accommodation, landscaping, hardstanding and associated works.

As published by the council, reference 2025/06137/PA

Timeline

Dates from the published record

  1. 31 Oct 2025

    Received by Birmingham

  2. 28 Nov 2025

    Validated

    Checked as complete and ready for consideration.

  3. 19 May 2026

    Decision issued: Approve subject to Conditions

  4. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/06328/PA Granted

    16 Windsor Street South Birmingham B7 4HY

    Application to determine the details for condition number 16,17,19,24 25 and 31 (16 Requires the prior submission of a contamination remediation scheme 17 Requires the submission of a contaminated land verification report 19 Requires the prior submission of a construction method statement/management plan 24 Requires the prior submission of drainage plans for the disposal of foul and surface water 25 Requires the prior submission of a sustainable drainage scheme 31 Arboricultural Method Statement - Submission Required) attached to reference number 2020/10411/PA

    10 Nov 2025 135m away Conditions
  • 2025/05309/PA Refused

    Outside University Locks 50 Curzon Street Birmingham B4 7XJ

    Application for a prior notification for the installation of 20m high telecommunications mast with associated antennas, equipment cabinets and ancillary development works

    19 Sep 2025 194m away Telecoms
  • 2026/02812/PA Granted

    Former Chemical Engineering and Applied Chemistry (CEAC) Building and associated car park Corner of Jennens Road and James Watt Queensway City Centre Birmingham B4 7PS

    Application to determine the details for condition 23 (Contaminated Land Verification Report) attached to reference number 2019/04239/PA.

    22 May 2026 441m away Conditions

In Birmingham

  • 2026/02114/PA Granted

    footpath outside 30 New John Street Birmingham B19 3NB

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02177/PA Withdrawn

    1 Braham Street London E1 8EE England

    Installation of 1No. BT Street Hub Unit and associated advertisement panels on either side of the unit

    20 Apr 2026 Full applications
  • 2026/01961/PA Granted

    Bellfield Junior And Infant School, Vineyard Road, Birmingham, B31 1PT

    Part demolition of existing building and erection of single storey side extension.

    14 Apr 2026 Full applications
  • 2026/02398/PA Refused

    8 Baker Street Springfield Birmingham B11 4SF

    Change of use of ground floor from retail (Use Class E) to 2no. self-contained apartments (Use Class C3)

    1 May 2026 Full applications
  • 2026/04370/PA Awaiting decision

    Birmingham Dental Hospital And School Of Dentistry, 5 Mill Pool Way, Birmingham, B5 7EG

    Erection of two single storey extensions to temporary Dental Hospital Operating Theatre and continued use until 31 October 2031.

    23 Jul 2026 Full applications