Skip to content
PlanIndex Get alerts
Menu

Planning application

2025/05948/PA

35 Bellis Street Birmingham B16 9AA

Granted Birmingham Permitted Development Householder

Proposal

Erection of 4 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

As published by the council, reference 2025/05948/PA

Timeline

Dates from the published record

  1. 20 Oct 2025

    Received by Birmingham

  2. 28 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 26 Nov 2025

    Decision issued: No Prior Approval Required

  4. 20 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 2026/02696/PA Granted

    16 Bellis Street, Birmingham, B16 9AA

    Erection of 4.05 metre deep single storey rear extension. Maximum height 3.52 metre deep single storey rear extension. Maximum height 2.71 metres

    14 May 2026 52m away Prior approval
  • 2025/06667/PA Refused

    2 Wyndham Road Edgbaston Birmingham B16 9RH

    Application for a lawful development certificate for an existing loft conversion with rear dormer window.

    26 Nov 2025 103m away Lawful development
  • 2024/07021/PA Refused

    201A Hagley Road Edgbaston Birmingham B16 9RE

    Erection of single storey rear extension (retrospective), forward enclosed seating area and upward extension to existing flue to rear

    5 Nov 2024 112m away Full applications
  • 2025/04715/PA Granted

    191-193 Hagley Road Edgbaston Birmingham B16 9RD

    Display of 1no. externally illuminated fascia sign and 3no. other non illuminated signs

    22 Aug 2025 113m away Advertising
  • 2025/04948/PA Granted

    St Chads Court 213 Hagley Road Edgbaston Birmingham B16 9RG

    Application to determine the details for condition number 20 (submission of strategy for repair and work to historic fabric of original wings of St Chads Court and St Chads House) attached to reference number 2023/05593/PA

    4 Sep 2025 172m away Conditions
  • 2025/04952/PA Granted

    St Chads Court 213 Hagley Road Edgbaston Birmingham B16 9RG

    Application to determine the details for condition number 21 (Submission of full architectural and specification details for Blocks D and E) attached to reference number 2023/05593/PA

    4 Sep 2025 172m away Conditions

In Birmingham

  • 2026/04472/PA Awaiting decision

    29 Lodge Road, Birmingham, B6 6LU

    Erection of 4 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    28 Jul 2026 Prior approval
  • 2026/04470/PA Awaiting decision

    222 Sommerfield Road, Birmingham, B32 3TA

    Erection of 5 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.5 metres

    28 Jul 2026 Prior approval
  • 2026/04477/PA Awaiting decision

    181 Robin Hood Lane, Birmingham, B28 0JE

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.5 metres

    28 Jul 2026 Prior approval
  • 2026/00429/PA Granted

    Former Gas Works Watson Road Birmingham

    Application for a prior notification for proposed demolition of existing buildings

    27 Jan 2026 Prior approval
  • 2026/03278/PA Granted

    125 Lyttelton Road, Birmingham, B33 8BN

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    15 Jun 2026 Prior approval