Skip to content
PlanIndex Get alerts
Menu

Planning application

85 - 87 Vittoria Street, Birmingham, B1 3NU

Awaiting decision Birmingham 2025/01534/PA Full Planning

Works: Extension Several homes

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use from Class E to mixed use Class E (commercial, business and service) and C3 (5no. dwellings) and 3 storey rear extension

As published by the council, reference 2025/01534/PA

Application record

Reference
2025/01534/PA
Type
Full Planning
Status
REGISTERED: Pending recommendation
Received
17 Mar 2025
Validated
9 Jun 2025
Ward
Soho & Jewellery Quarter
Postcode
B1 3NU

Timeline

Dates from the published record

  1. 17 Mar 2025

    Received by Birmingham

  2. 9 Jun 2025

    Validated

    Checked as complete and ready for consideration.

  3. 7 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 4 August 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Birmingham took a median of 61 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

60 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Birmingham for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 85 - 87 Vittoria Street, Birmingham, B1 3NU

    2025/01559/PA Submitted 17 Mar 2025 0m away

    87% historically approved · decision due ~4 Aug

    Listed building consent for internal and external alterations including a 3 storey rear extension associated with a change of use from Class E to Class E (commercial, business and service) and C3 (5no. dwellings)

    Awaiting decision Heritage and listed buildings Extension 51 docs
    Several homes
  • 38 Warstone Lane Jewellery Quarter Birmingham B18 6JQ

    2024/01959/PA Submitted 28 Mar 2024 44m away

    Listed building consent for the installation of replacement windows and door to the rear elevation

    Granted Heritage and listed buildings Windows or glazing 10 docs
  • 23-24 Warstone Lane Jewellery Quarter Birmingham B18 6JQ

    2022/07850/PA Submitted 19 Oct 2022 80m away

    Application to determine the details for condition 1 (architectural and specification details) attached to listed building consent 2021/05278/PA

    Granted Conditions 9 docs
  • 23-26 Warstone Lane Birmingham B18 6JQ

    2026/03831/PA Submitted 6 Jul 2026 83m away

    71% historically approved · decision due ~9 Oct

    Installation of photovoltaic panels to inner courtyard facing roof slopes and installation of two VRV units within the inner courtyard together with associated cabling, pipework, fixings and ancillary works

    Awaiting decision Full applications 15 docs
  • 23-26 Warstone Lane Birmingham B18 6JQ

    2026/03990/PA Submitted 6 Jul 2026 83m away

    87% historically approved · decision due ~9 Oct

    Listed building consent for the installation of photovoltaic panels to inner courtyard facing roof slopes and installation of two VRV units within the inner courtyard together with associated cabling, pipework, fixings and ancillary works

    Awaiting decision Heritage and listed buildings 16 docs
  • JQ Modern 120 Vyse Street Birmingham B18 6NB

    2024/05449/PA Submitted 20 Aug 2024 116m away

    Notification for Prior Approval for the installation of 273 roof mounted Solar PV panels

    Granted Prior approval 8 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications