Skip to content
PlanIndex Get alerts
Menu

Planning application

361 Park Road Hockley Birmingham B18 5ST

Granted Birmingham 2024/07315/PA Full Planning

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use of land and buildings to a vehicle hire depot (sui generis) including yard extension, wash bay and self bunded fuel tank.

As published by the council, reference 2024/07315/PA

Application record

Reference
2024/07315/PA
Type
Full Planning
Status
Conditions
Decision
Approve subject to Conditions
Received
19 Nov 2024
Validated
25 Nov 2024
Decided
10 Apr 2025
Ward
Soho & Jewellery Quarter
Postcode
B18 5ST

Timeline

Dates from the published record

  1. 19 Nov 2024

    Received by Birmingham

  2. 25 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 10 Apr 2025

    Decision issued: Approve subject to Conditions

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

18 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 361 Park Road Hockley Birmingham B18 5ST

    2025/05605/PA Submitted 3 Oct 2025 0m away

    Application to determine the details for condition number 3 (Bird/Bat Boxes) 4 (Precautionary Working Method Statement) 5 (Landscape and Ecological Management Plan) and the deemed Biodiversity Gain Plan condition attached to planning application reference 2024/07315/PA.

    Granted Conditions 14 docs
  • Unit 3 365-369 Park Road Soho Birmingham B18 5SR

    2025/03178/PA Submitted 9 Jun 2025 65m away

    Extension to unit 3 to create storage area

    Withdrawn Full applications Extension 3 docs
  • The Black Eagle, 16 Factory Road, Birmingham, B18 5JU

    2026/01739/PA Submitted 1 Apr 2026 136m away

    96% historically approved · decision due ~18 Jun

    Application to determine the details for condition number (6 - Submission of a contamination remediation scheme) attached to reference number 2024/01720/PA

    Awaiting decision Conditions 4 docs
  • Oasis Academy Benson Benson Road Handsworth Birmingham B18 5TD

    2026/04092/PA Submitted 10 Jul 2026 151m away

    87% historically approved · decision due ~22 Oct

    Listed Building consent for installation of solar panels on flat roofs to rear

    Awaiting decision Heritage and listed buildings 13 docs
  • Oasis Academy Benson Benson Road Handsworth Birmingham B18 5TD

    2026/03919/PA Submitted 10 Jul 2026 151m away

    71% historically approved · decision due ~22 Oct

    Installation of solar panels on flat roofs to rear

    Awaiting decision Full applications 20 docs
  • M Lambe Construction Newton Place Hockley Birmingham B18 5JY

    2024/03399/PA Submitted 30 May 2024 173m away

    Application to determine the details for condition 8 (Construction Method Statement), condition 9 (Prevent mud on the highway), condition 13 (Pavement boundary), condition 16 (Cycle Storage Details), condition 17 (Vehicle Management Scheme) and condition 20 (Access road levels and surface water prevention run off into Factory Road measures) attached to approval 2023/07461/PA.

    Granted Conditions 10 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications