Skip to content
PlanIndex Get alerts
Menu

Planning application

Alvi House 38a Alum Rock Road Birmingham B8 1JA

Granted Birmingham 2024/06132/PA Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from Class E (A), retail, to Class E (B), restaurant, (ground and first floor including above 38B) and installation of commercial extractor flue on the western side of the property

As published by the council, reference 2024/06132/PA

Application record

Reference
2024/06132/PA
Type
Full Planning
Status
Decided: APPROVE SUBJECT TO CONDITIONS
Decision
APPROVE SUBJECT TO CONDITIONS
Received
23 Sep 2024
Validated
30 Oct 2024
Decided
25 Nov 2024
Ward
Alum Rock
Postcode
B8 1JA

Timeline

Dates from the published record

  1. 23 Sep 2024

    Received by Birmingham

  2. 30 Oct 2024

    Validated

    Checked as complete and ready for consideration.

  3. 25 Nov 2024

    Decision issued: APPROVE SUBJECT TO CONDITIONS

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

5 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 47 Alum Rock Road Saltley Birmingham B8 1LR

    2023/04457/PA Submitted 4 Jul 2023 30m away

    Application to determine the details for conditions numbers 3 (materials), 4 (level details), 5 (boundary treatment), 6 (roller shutter details), 7 (prior submission of a construction method statement/management plan), 8 (details to prevent mud on the highway) and 9 (cycle storage) attached to approval 2020/10272/PA.

    Granted Conditions 15 docs
  • 32 Alum Rock Road Saltley Birmingham B8 1JB

    2024/04138/PA Submitted 26 Jun 2024 61m away

    First floor rear extension

    Granted Full applications Extension 9 docs
  • 1 Alum Rock Road Saltley Birmingham B8 1LL

    2023/07518/PA Submitted 7 Nov 2023 112m away

    Demolition of existing buildings and the erection of a four storey building, with five retail units at ground floor and no. 12 residential units above, with associated works

    Refused Full applications Demolition 7 docs
  • Outside 7-13 Alum Rock Road Saltley Birmingham B8 1LL

    2025/04278/PA Submitted 5 Aug 2025 112m away

    Installation of 1no. BT street hub unit

    Granted Full applications 10 docs
  • Outside 7-13 Alum Rock Road Saltley Birmingham B8 1LL

    2025/04380/PA Submitted 5 Aug 2025 112m away

    Display of 2no. internally illuminated digital advertisement panels on BT street hub unit

    Granted Advertising 10 docs
  • 75 Alum Rock Road Alum Rock Birmingham B8 1LY

    2023/05582/PA Submitted 16 Aug 2023 123m away

    Retention of single storey rear extension, change of use of first and second floors to residential flat (Use Class C3), installation of rear dormer, amendments to fenestration and associated works

    Granted Full applications Extension Loft or dormer +1 15 docs
    Small domestic

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications