Skip to content
PlanIndex Get alerts
Menu

Planning application

177 Tamworth Road, Birmingham, B75 6DY

Granted Birmingham 2024/05454/PA Permitted Development Householder

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 7.2 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

As published by the council, reference 2024/05454/PA

Application record

Reference
2024/05454/PA
Type
Permitted Development Householder
Status
Decided: NO PRIOR APPROVAL REQUIRED
Decision
NO PRIOR APPROVAL REQUIRED
Received
22 Aug 2024
Validated
22 Aug 2024
Decided
24 Sep 2024
Ward
Sutton Trinity
Postcode
B75 6DY

Site history

Applications at this address on the Birmingham register

This site has had 2 applications since 2024: 2 approved, 0 refused.

  • 2024/00205/PA Granted

    177 Tamworth Road Birmingham B75 6DY

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    Decided 9 Feb 2024 Prior approval

Timeline

Dates from the published record

  1. 22 Aug 2024

    Received by Birmingham

  2. 24 Sep 2024

    Decision issued: NO PRIOR APPROVAL REQUIRED

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Birmingham granted permission on 24 September 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 173 Tamworth Road, Birmingham, B75 6DY

    2024/06268/PA Submitted 30 Sep 2024 21m away

    Erection of single storey rear extension

    Granted Householder Extension 10 docs
    Small domestic
  • 151 Tamworth Road Sutton Coldfield Birmingham B75 6DY

    2023/05552/PA Submitted 15 Aug 2023 97m away

    Erection of single storey rear extension and loft conversion with associated roof lights

    Granted Householder Extension Loft or dormer 11 docs
    Small domestic
  • 189 Tamworth Road Sutton Coldfield Birmingham B75 6DY

    2024/02764/PA Submitted 3 May 2024 97m away

    Erection of two storey rear extension including balcony

    Refused Householder Extension 10 docs
    Domestic
  • 177 Tamworth Road Birmingham B75 6DY

    2024/00205/PA Submitted 10 Jan 2024 97m away

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    Granted Prior approval Extension 4 docs
    Small domestic
  • 185 Bedford Road Sutton Coldfield Birmingham B75 6DB

    2022/07280/PA Submitted 26 Sep 2022 127m away

    Erection of two storey side, single storey rear and single storey forward extensions

    Granted Householder Extension 12 docs
    Small domestic
  • 170 Bedford Road Sutton Coldfield Birmingham B75 6AL

    2024/01163/PA Submitted 23 Feb 2024 153m away

    Application to determine the details of condition number 1 (implement within 3 years (Full)), 2 (scheme to be in accordance with the listed approved plans), 3 (removes PD rights for extensions and windows (other than rooflights)), 4 (requires the provision of a vehicle charging point), 5 (limits the use to being incidental to the dwelling), 6 (requires the submission and approval of external materials and detailing), 7 (requires the submission of hard and/or soft landscape details) and 8 (requires the submission of boundary treatment details) attached to planning application 2023/05980/PA.

    Refused Conditions Extension Loft or dormer +1 7 docs
    Domestic

In Birmingham

  • 2026/04402/PA Granted

    69 Dads Lane, Birmingham, B13 8PG

    Erection of 5 metre deep single storey rear extension. Maximum height 3.7 metres, eaves height 2.7 metres

    22 Jul 2026 Prior approval
  • 2026/04343/PA Granted

    45 Horse Shoes Lane, Birmingham, B26 3HS

    Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.8 metres

    15 Jul 2026 Prior approval
  • 2026/05415/PA Awaiting decision

    90 Hoggs Lane, Birmingham, B31 1SR

    Erection of 5.07 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    2 Sep 2026 Prior approval
  • 2026/05432/PA Awaiting decision

    35 Albert Road, Birmingham, B21 9LA

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    2 Sep 2026 Prior approval
  • 2026/04564/PA Granted

    307 Streetly Road, Birmingham, B23 5JN

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    31 Jul 2026 Prior approval