Skip to content
PlanIndex Get alerts
Menu

Planning application

205-207 Lakey Lane Hall Green Birmingham B28 8QT

Granted Birmingham 2024/04615/PA Full Planning

Works: New dwelling Demolition Several homes

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing building and erection of a two-and-a-half storey building to create eight flats

As published by the council, reference 2024/04615/PA

Application record

Reference
2024/04615/PA
Type
Full Planning
Status
Conditions
Decision
Approve subject to Conditions
Received
15 Jul 2024
Validated
20 Aug 2024
Decided
6 Oct 2025
Ward
Hall Green North
Postcode
B28 8QT

Timeline

Dates from the published record

  1. 15 Jul 2024

    Received by Birmingham

  2. 20 Aug 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 Oct 2025

    Decision issued: Approve subject to Conditions

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

10 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 4 Gospel Farm Road Acocks Green Birmingham B27 7JN

    2024/07700/PA Submitted 4 Dec 2024 95m away

    Change of use from retail shop (Use Class E) to fast food takeaway (Sui Generis)

    Withdrawn Full applications 11 docs
  • 5 Broom Hall Crescent Acocks Green Birmingham B27 7JR

    2024/03656/PA Submitted 7 Jun 2024 99m away

    Application for a Lawful Development Certificate for a proposed rear dormer and front rooflight.

    Decided Lawful development Loft or dormer 6 docs
  • 26 Mapleton Grove Birmingham B28 9RG

    2023/05810/PA Submitted 24 Aug 2023 100m away

    Erection of 3.6 metre deep single storey rear extension. Maximum height 2.9 metres, eaves height 2.4 metres

    Granted Prior approval Extension 7 docs
    Small domestic
  • 133 Mapleton Road Birmingham B28 9RE

    2025/07108/PA Submitted 18 Dec 2025 128m away

    Erection of two storey side and single storey rear extension

    Granted Householder Extension 8 docs
    Small domestic
  • 31 Creswell Road Hall Green Birmingham B28 9RN

    2024/00056/PA Submitted 5 Jan 2024 129m away

    Erection of a three storey side and rear extension with loft conversions and the installation of dormer windows to the rear and side to create six additional residential flats with parking, landscaping and associated works

    Granted Full applications New dwelling Extension +2 15 docs
  • 133 Mapleton Road, Birmingham, B28 9RE

    2026/03320/PA Submitted 18 Jun 2026 139m away

    89% historically approved · decision due ~21 Sep

    Variation of Condition 2 attached to Planning Permission 2025/07108/PA to allow the approved rear extension and side extension to be connected, together with the repositioning of the front entrance door within the side extension.

    Awaiting decision Amendments Extension 6 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications