Skip to content
PlanIndex Get alerts
Menu

Planning application

15 Tarrington Covert Birmingham B38 9TG

Granted Birmingham 2024/04086/PA Permitted Development Householder

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Erection of 6 metre deep single storey rear extensions. Maximum height 2.75 metres, eaves height 2.75 metres

As published by the council, reference 2024/04086/PA

Application record

Reference
2024/04086/PA
Type
Permitted Development Householder
Status
Permitted
Decision
No Prior Approval Required
Received
23 Jun 2024
Validated
25 Jun 2024
Decided
22 Jul 2024
Ward
King's Norton South
Postcode
B38 9TG

Timeline

Dates from the published record

  1. 23 Jun 2024

    Received by Birmingham

  2. 25 Jun 2024

    Validated

    Checked as complete and ready for consideration.

  3. 22 Jul 2024

    Decision issued: No Prior Approval Required

  4. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About prior approval applications

How this application type works

Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.

More on prior approval applications in our guide

Nearby applications

Within 500 metres

  • 8 Stockmans Close Hawkesley Birmingham B38 9AX

    2023/07589/PA Submitted 9 Nov 2023 96m away

    Installation of access ramp with railings to front

    Granted Householder 5 docs
    Domestic
  • 40 Eckington Walk Birmingham B38 9TF

    2026/00706/PA Submitted 11 Feb 2026 97m away

    Installation of ramped access to front

    Granted Householder 3 docs
    Domestic
  • 28 Green Lane Birmingham B38 9DW

    2023/08320/PA Submitted 8 Dec 2023 130m away

    Erection of 4 metre deep single storey rear extension. Maximum height 3.1 metres. Eaves height 2.75 metres.

    Granted Prior approval Extension 3 docs
    Small domestic
  • Land off Foyle Road and land off Redditch Road Kings Norton Birmingham B38

    2026/00323/PA Submitted 26 Jan 2026 184m away

    89% historically approved · decision due ~5 May

    Variation of Condition 2 (Approved Plans) and removal of Condition 26 (Affordable Housing) on application 2021/02131/PA.

    Awaiting decision Amendments 13 docs
  • 372 Shannon Road Birmingham B38 9TR

    2023/07225/PA Submitted 23 Oct 2023 220m away

    Application to determine if prior approval is required for a proposed change of use from community building (Use Class F2) to 1 no. dwellinghouse (Use Class C3)

    Withdrawn Prior approval 4 docs
    Domestic
  • 372 Shannon Road Kings Norton Birmingham B38 9TR

    2023/08294/PA Submitted 8 Dec 2023 220m away

    Change of use of from church/community building (Use Class F1) to a single dwelling house (Use Class C3)

    Granted Full applications 6 docs
    Domestic

In Birmingham

  • 2026/04402/PA Granted

    69 Dads Lane, Birmingham, B13 8PG

    Erection of 5 metre deep single storey rear extension. Maximum height 3.7 metres, eaves height 2.7 metres

    22 Jul 2026 Prior approval
  • 2026/04343/PA Granted

    45 Horse Shoes Lane, Birmingham, B26 3HS

    Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.8 metres

    15 Jul 2026 Prior approval
  • 2026/05415/PA Awaiting decision

    90 Hoggs Lane, Birmingham, B31 1SR

    Erection of 5.07 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    2 Sep 2026 Prior approval
  • 2026/05432/PA Awaiting decision

    35 Albert Road, Birmingham, B21 9LA

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres

    2 Sep 2026 Prior approval
  • 2026/04564/PA Granted

    307 Streetly Road, Birmingham, B23 5JN

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    31 Jul 2026 Prior approval