Skip to content
PlanIndex Get alerts
Menu

Planning application

27 Poplar Avenue Harborne Birmingham B17 8EG

Granted Birmingham 2024/02817/PA Demolition Determination

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Application for a prior notification for the demolition of existing building

As published by the council, reference 2024/02817/PA

Application record

Reference
2024/02817/PA
Type
Demolition Determination
Status
Conditions
Decision
Prior Approval Required and to Approve with Conditions
Received
7 May 2024
Validated
20 May 2024
Decided
7 Jun 2024
Ward
North Edgbaston
Postcode
B17 8EG

Timeline

Dates from the published record

  1. 7 May 2024

    Received by Birmingham

  2. 20 May 2024

    Validated

    Checked as complete and ready for consideration.

  3. 7 Jun 2024

    Decision issued: Prior Approval Required and to Approve with Conditions

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Birmingham granted permission on 7 June 2024, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About prior approval applications

Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 71 Poplar Avenue Harborne Birmingham B17 8EG

    2025/05385/PA Submitted 24 Sep 2025 0m away

    Erection of single storey rear extension

    Granted Householder Extension 10 docs
    Small domestic
  • 28 Poplar Avenue, Birmingham, B17 8ES

    2026/00676/PA Submitted 10 Feb 2026 117m away

    Erection of single storey front and rear extensions

    Granted Householder Extension 14 docs
    Small domestic
  • 43 Willow Avenue Birmingham B17 8HP

    2026/01639/PA Submitted 27 Mar 2026 198m away

    Erection of detached outbuilding to rear

    Granted Householder 5 docs
    Small domestic
  • Former Sandon Road Methodist Church Sandon Road Birmingham Edgbaston B17 8HA

    2025/05118/PA Submitted 12 Sep 2025 200m away

    Application to determine the details for condition number 4 (sustainable drainage operation and maintenance plan) attached to approval 2023/05142/PA

    Refused Conditions
  • Former Sandon Road Methodist Church, Sandon Road Birmingham B17 8HA

    2026/00667/PA Submitted 10 Feb 2026 200m away

    Application to determine the details for condition number (7- Submission of a contaminated land verification report ) attached to reference number 2023/05142/PA

    Granted Conditions 3 docs
  • Former Sandon Road Methodist Church 121 Sandon Road Edgbaston Birmingham B17 8HA

    2023/05142/PA Submitted 28 Jul 2023 200m away

    Variation of condition 2 (approved plans) attached to planning approval 2022/08311/PA, to allow for amendments to the fenestration of the eastern side elevation of the block (apartments 9 and 12), realignment of the footpath to the rear of the block (apartments 7-14), changes to the gross internal area of the block (apartments 7-14) and resiting of the two storey access stairwell /door serving apartment 12 to the rear of the block.

    Granted Amendments New dwelling Windows or glazing 14 docs

In Birmingham

  • 2026/05621/PA Awaiting decision

    117 Middlemore Road, Birmingham, B31 3UL

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    7 Sep 2026 Prior approval
  • 2026/05634/PA Awaiting decision

    41 Bracebridge Road, Birmingham, B24 8JQ

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres

    7 Sep 2026 Prior approval
  • 2026/04593/PA Granted

    100 South Road, Birmingham, B23 6EJ

    Erection of 4 metre deep single storey rear extension. Maximum height 3.3 metres, eaves height 2.25 metres

    1 Aug 2026 Prior approval
  • 2026/04604/PA Granted

    9 Hailsham Road, Birmingham, B23 6JR

    Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.8 metres

    1 Aug 2026 Prior approval
  • 2026/04608/PA Granted

    51 Fallindale Road, Birmingham, B26 3YR

    Erection of 6 metre deep single storey rear extension. Maximum height 3.8 metres, eaves height 2.6 metres

    31 Jul 2026 Prior approval