Skip to content
PlanIndex Get alerts
Menu

Planning application

72 Grange Road Erdington Birmingham B24 0DF

Granted Birmingham 2024/02516/PA Full Planning

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from offices (Use Class E) to a dwellinghouse (Use Class C3)

As published by the council, reference 2024/02516/PA

Application record

Reference
2024/02516/PA
Type
Full Planning
Status
Decided: APPROVE SUBJECT TO CONDITIONS
Decision
APPROVE SUBJECT TO CONDITIONS
Received
24 Apr 2024
Validated
17 Jul 2024
Decided
25 Sep 2024
Ward
Erdington
Postcode
B24 0DF

Timeline

Dates from the published record

  1. 24 Apr 2024

    Received by Birmingham

  2. 17 Jul 2024

    Validated

    Checked as complete and ready for consideration.

  3. 25 Sep 2024

    Decision issued: APPROVE SUBJECT TO CONDITIONS

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 72 Grange Road Birmingham B24 0DF

    2024/00754/PA Submitted 2 Feb 2024 21m away

    Application to determine if prior approval is required for a proposed change of use from offices (Use Class E) to a dwellinghouse (Use Class C3)

    Withdrawn Prior approval 6 docs
    Domestic
  • 8 Cedar Drive Pype Hayes Birmingham B24 0DL

    2024/01678/PA Submitted 15 Mar 2024 141m away

    Retention of single and two storey side and single storey rear extension and dormer window to the rear

    Granted Householder Extension Loft or dormer +1 9 docs
    Small domestic
  • 42 Grange Road Erdington Birmingham B24 0DE

    2026/04283/PA Submitted 21 Jul 2026 147m away

    87% historically approved · decision due ~27 Oct

    Erection of a part single-storey and part two-storey rear extension, conversion of the existing garage to a habitable room, and installation of a dormer window to the front

    Awaiting decision Householder Extension Loft or dormer +1 2 docs
    Small domestic
  • 87 Grange Road Erdington Birmingham B24 0ET

    2023/04852/PA Submitted 18 Jul 2023 168m away

    Erection of part two, part single storey forward, side and rear extensions and dormer window to rear.

    Granted Householder Extension Loft or dormer +1 7 docs
    Small domestic
  • 93 Grange Road Erdington Birmingham B24 0ET

    2024/05126/PA Submitted 7 Aug 2024 168m away

    Erection of single storey rear/side and first floor side extension and garage conversion to habitable room.

    Granted Householder Extension 9 docs
    Small domestic
  • 11 Chestnut Drive Erdington Birmingham B24 0DN

    2024/07104/PA Submitted 23 Oct 2024 174m away

    Erection of single storey rear extension

    Granted Householder Extension 6 docs
    Small domestic

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications