Skip to content
PlanIndex Get alerts
Menu

Planning application

128 Beeches Road Perry Barr Birmingham B42 2HQ

Refused Birmingham 2024/00903/PA Full Planning

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Refused. Only the applicant can appeal, within the statutory time limit, and a revised scheme can be submitted instead.

Proposal

Erection of single storey side and rear extensions with installation of external metal staircase for access to flat and alterations to front

As published by the council, reference 2024/00903/PA

Application record

Reference
2024/00903/PA
Type
Full Planning
Status
Rejected
Decision
Refuse
Received
12 Feb 2024
Validated
2 Apr 2024
Decided
20 May 2024
Ward
Perry Barr
Postcode
B42 2HQ

Timeline

Dates from the published record

  1. 12 Feb 2024

    Received by Birmingham

  2. 2 Apr 2024

    Validated

    Checked as complete and ready for consideration.

  3. 20 May 2024

    Decision issued: Refuse

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

11 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 92 Beeches Road Birmingham B42 2HQ

    2026/01766/PA Submitted 31 Mar 2026 0m away

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Refused Prior approval Extension 4 docs
    Small domestic
  • 92 Beeches Road Perry Barr Birmingham B42 2HQ

    2026/03259/PA Submitted 16 Jun 2026 49m away

    Application for a lawful development certificate for proposed hip to gable roof extension with dormer window to rear and rooflight to front and single storey outbuilding to the rear garden

    Decided Lawful development Extension Loft or dormer +1 7 docs
    Small domestic
  • 77 Beeches Road Birmingham B42 2HL

    2023/06476/PA Submitted 21 Sep 2023 73m away

    Erection of 7.3 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 77 Beeches Road Great Barr Birmingham B42 2HL

    2023/06458/PA Submitted 22 Sep 2023 73m away

    Erection of two storey side extension, single storey front, single storey rear and conservatory to the rear.

    Granted Householder Extension 8 docs
    Small domestic
  • 66 Monsal Road Perry Barr Birmingham B42 2DH

    2022/07328/PA Submitted 26 Sep 2022 159m away

    Erection of single storey side extension

    Refused Householder Extension 13 docs
    Small domestic
  • 10 Duxford Road, Birmingham, B42 2JE

    2024/05803/PA Submitted 6 Sep 2024 205m away

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Granted Prior approval Extension 3 docs
    Small domestic

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications