Skip to content
PlanIndex Get alerts
Menu

Planning application

Brookvale Social Club 9 Anchorage Road Stockland Green Birmingham B23 7LJ

Granted Birmingham 2024/00844/PA Full Planning

Works: Demolition Major scheme

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of existing buildings and redevelopment to provide 14 units with day centre and offices

As published by the council, reference 2024/00844/PA

Application record

Reference
2024/00844/PA
Type
Full Planning
Status
Conditions
Decision
Approve subject to Conditions
Received
9 Feb 2024
Validated
19 Apr 2024
Decided
21 Jun 2024
Ward
Stockland Green
Postcode
B23 7LJ

Timeline

Dates from the published record

  1. 9 Feb 2024

    Received by Birmingham

  2. 19 Apr 2024

    Validated

    Checked as complete and ready for consideration.

  3. 21 Jun 2024

    Decision issued: Approve subject to Conditions

  4. 18 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

39 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Brookvale Social Club 9 Anchorage Road Stockland Green Birmingham B23 7LJ

    2024/06443/PA Submitted 8 Oct 2024 0m away

    Discharge of conditions 3 (Drainage), 4 (Contamination Remediation), 9 (External Materials and Details), 10 (Building and Site Levels) and 11 (Hard Surfacing) attached to planning permission 2024/00844/PA

    Granted Conditions 14 docs
  • 35 Frances Road Stockland Green Birmingham B23 7LD

    2026/02513/PA Submitted 8 May 2026 92m away

    Change of use from dwellinghouse (Use Class C3) to Children's care home (Use Class C2)

    Refused Full applications 10 docs
    Domestic
  • 19 Victoria Road Birmingham B23 7LR

    2024/01861/PA Submitted 21 Mar 2024 133m away

    Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres. Eaves height 2.8 metres.

    Granted Prior approval Extension 3 docs
    Small domestic
  • 4 Kings Road, Birmingham, B23 7JS

    2026/02631/PA Submitted 12 May 2026 134m away

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Granted Prior approval Extension 3 docs
    Small domestic
  • 64 Gladstone Road Stockland Green Birmingham B23 7LS

    2023/07877/PA Submitted 21 Nov 2023 146m away

    Proposed reduction to single storey rear extension and front porch alterations

    Granted Householder Extension 6 docs
    Small domestic
  • 64 Gladstone Road Stockland Green Birmingham B23 7LS

    2023/02755/PA Submitted 27 Apr 2023 146m away

    Application for a Lawful Development Certificate for a proposed reduction to single storey rear extension and front porch alterations

    Withdrawn Lawful development Extension 3 docs
    Small domestic

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications