Planning application
29 Botha Road Birmingham B9 5LU
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.6 metres
As published by the council, reference 2024/00035/PA
Application record
- Reference
- 2024/00035/PA
- Type
- Permitted Development Householder
- Status
- Permitted
- Decision
- No Prior Approval Required
- Received
- 3 Jan 2024
- Validated
- 9 Jan 2024
- Decided
- 7 Feb 2024
- Ward
- Heartlands
- Postcode
- B9 5LU
Timeline
Dates from the published record
-
3 Jan 2024
Received by Birmingham
-
9 Jan 2024
Validated
Checked as complete and ready for consideration.
-
7 Feb 2024
Decision issued: No Prior Approval Required
-
27 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
3 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About prior approval applications
How this application type works
Prior approval applications arise where permitted development rights already grant the principle of the work, such as larger home extensions, changes of use to housing or agricultural buildings. The council may only consider the specific matters set out in the rules, for example transport, flooding or appearance, and in many classes the work may proceed if the council does not respond within the deadline, commonly 56 days.
Nearby applications
Within 500 metres
-
Domestic
-
80 Botha Road Birmingham B9 5LT
Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.9 metres
Refused Prior approval ExtensionSmall domestic -
80 Botha Road Birmingham B9 5LT
Erection of single storey rear and single storey forward extensions
Granted Householder Extension 9 docsSmall domestic -
75 Colonial Road Bordesley Green Birmingham B9 5NR
Erection of part two, part single storey rear extension.
Granted Householder Extension 5 docsSmall domestic -
35 Colonial Road Bordesley Green Birmingham B9 5NR
Retention of dormer window to front
Refused Householder Loft or dormer Windows or glazing 5 docsDomestic -
88 Botha Road, Birmingham, B9 5LP
Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.5 metres
Withdrawn Prior approval Extension 2 docsSmall domestic
Other prior approval applications
In Birmingham
-
2026/04402/PA Granted
69 Dads Lane, Birmingham, B13 8PG
Erection of 5 metre deep single storey rear extension. Maximum height 3.7 metres, eaves height 2.7 metres
-
2026/04343/PA Granted
45 Horse Shoes Lane, Birmingham, B26 3HS
Erection of 6 metre deep single storey rear extension. Maximum height 3.9 metres, eaves height 2.8 metres
-
2026/05415/PA Awaiting decision
90 Hoggs Lane, Birmingham, B31 1SR
Erection of 5.07 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres
-
2026/05432/PA Awaiting decision
35 Albert Road, Birmingham, B21 9LA
Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 2.6 metres
-
2026/04564/PA Granted
307 Streetly Road, Birmingham, B23 5JN
Erection of 6 metre deep single storey rear extension. Maximum height 3 metres, eaves height 3 metres