Skip to content
PlanIndex Get alerts
Menu

Planning application

St Ambrose Barlow Roman Catholic Church Lakey Lane Hall Green Birmingham B28 8QU

Granted Birmingham 2023/08254/PA Full Planning

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement of 2no. existing fire escape doors and installation of a new fire escape door and a window to the parish hall building

As published by the council, reference 2023/08254/PA

Application record

Reference
2023/08254/PA
Type
Full Planning
Status
Conditions
Decision
Approve subject to Conditions
Received
6 Dec 2023
Validated
14 Dec 2023
Decided
1 Feb 2024
Ward
Acocks Green
Postcode
B28 8QU

Timeline

Dates from the published record

  1. 6 Dec 2023

    Received by Birmingham

  2. 14 Dec 2023

    Validated

    Checked as complete and ready for consideration.

  3. 1 Feb 2024

    Decision issued: Approve subject to Conditions

  4. 29 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

14 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • St Ambrose Barlow Roman Catholic Church Lakey Lane Hall Green Birmingham B28 8QU

    2024/05024/PA Submitted 2 Aug 2024 50m away

    Part demolition and erection of replacement link building connecting church hall and church and two new entrance doors

    Granted Full applications Demolition 14 docs
  • 175 Lakey Lane, Birmingham, B28 8RX

    2026/04858/PA Submitted 8 Aug 2026 63m away

    89% historically approved · decision due ~5 Oct

    Erection of 6 metre deep single storey rear extension. Maximum height 4 metres, eaves height 3 metres

    Awaiting decision Prior approval Extension 2 docs
    Small domestic
  • 266 Lakey Lane Hall Green Birmingham B28 8RA

    2025/04791/PA Submitted 27 Aug 2025 83m away

    Erection of 2no. self contained flats (Use Class C3)

    Refused Full applications New dwelling 23 docs
  • 31 Creswell Road Hall Green Birmingham B28 9RN

    2024/00056/PA Submitted 5 Jan 2024 132m away

    Erection of a three storey side and rear extension with loft conversions and the installation of dormer windows to the rear and side to create six additional residential flats with parking, landscaping and associated works

    Granted Full applications New dwelling Extension +2 15 docs
  • 5 Stonehaven Grove Birmingham B28 8PJ

    2026/00217/PA Submitted 19 Jan 2026 160m away

    Erection of single storey front, two storey side and single storey rear extensions

    Granted Householder Extension 5 docs
    Small domestic
  • 5 Broom Hall Crescent Acocks Green Birmingham B27 7JR

    2024/03656/PA Submitted 7 Jun 2024 169m away

    Application for a Lawful Development Certificate for a proposed rear dormer and front rooflight.

    Decided Lawful development Loft or dormer 6 docs

In Birmingham

  • 2026/02132/PA Granted

    Outside 1690 Bristol Road Rednal Birmingham B45 9TZ

    Installation of 1no. BT street hub unit

    21 Apr 2026 Full applications
  • 2026/02004/PA Granted

    311 Fox Hollies Road Acocks Green Olton Birmingham B27 7PS

    Erection of single storey flat roof rear extension and rear dormer window to form additional bedrooms

    15 Apr 2026 Full applications
  • 2026/03109/PA Granted

    Wickes Tameside Business Park Aldridge Road Birmingham Perry Barr B42 2ET

    Alterations to existing shopfront comprising new glazing and associated works.

    12 Jun 2026 Full applications
  • 2025/05763/PA Granted

    land adj to 142 Melton Road Kings Heath Birmingham B14 7ES

    Demolition of existing structures/buildings and change of use from builders yard (sui generis) to domestic curtilage (Use Class C3) of no. 142 Melton Road along with associated works (erection of boundary treatment and gate)

    10 Oct 2025 Full applications
  • 2025/05722/PA Granted

    724A Yardley Wood Road Billesley Birmingham B13 0HY

    Installation of new extraction flue, air roof cowl and extract grilles to rear.

    9 Oct 2025 Full applications